Top-rated contractors.

Get matched with top contractors in Sawyerville, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Sawyerville, AL?

Select your specific project to find the pro for you.

Find Contractors in Sawyerville

Avatar for Halo Construction LLC
Halo Construction LLC
4.3(
73
)
Major Home Repairs (General Contractor)

Serving Sawyerville, AL and surrounding areas

In business since 2008

Free estimates

Emergency services offered

"Kristy,James and his men were a pleasant company to talk to and did excellent work. They had done some previous work for me a year ago that turned out great so I had no problem what so ever contacting him and his company again for this project. The work was great and looked better than I had expected it to look. I like James because he is honest and will give advice on a project if you ask it. The job was completed in the time he had said and was on budget. Cant wait to start using my new deck this summer. will use them again if I have anything else come up."
Additional Photos
Additional Photos
Darker Tile
Lighter Tile
Recommended by85%of homeowners
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)
Major Home Repairs (General Contractor)

Serving Sawyerville, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Sawyerville, AL and surrounding areas

In business since 2006

Credit card accepted

"When you purchase this service you are asked to send pictures of the room,  and a layout drawing  with the dimensions in inches.  I sent pictures from every angle in the room.  My layout drawing was rough, but I made sure that the dimensions were correct.  It is important to show doors, and width from door to wall, windows and spaces between window and wall, etc.

Explain how you invision the room and what you would like to keep in the room. You should let her know what you like and dislike as far as fabrics, colors, and style of furniture.  I hate paisley, but failed to include this in the information that I sent to the designer.  So there was some paisley in my concept board. I told her what I liked, but failed to tell her what I disliked and would not want to see in the room.

Once I sent pictures, dimensions, and room layout I received 2  suggested layouts for the room from Jill.  I selected the layout that I preferred.  You they receive a concept board for the room with  her suggested furnishings and fabrics. To my surprise she also gives alternatives to what she suggests.  Her suggestions are in various price ranges so that you can choose within your budget.

It is now in your hands to complete your room. 

"
Recommended by55%of homeowners
Showing 1-10 of 28
Unfinished Carpentry questions, answered by experts

It’s sometimes safe to replace a load-bearing wall with a beam, but you need a structural engineer to sign off on the project. You’ll also likely have to upgrade to a steel I-beam or another material that’s stronger than wood to maintain the level of support you need without the wall underneath.

By careful planning and reinforcement to maintain structural integrity.

Accurate measurements, sturdy materials, and seamless integration with other structures.

There are a variety of second-story deck privacy ideas depending on your budget and aesthetic. For starters, you might consider fencing or tall privacy railing that masks a good portion of the open deck. A pergola or an awning can provide additional cover and shade. Outdoor curtains are an easy way to add or remove privacy at your convenience, plus they’re a wallet-friendly way to decorate your deck.

When deciding whether to use nails or screws for framing, the specific needs of the project must be taken into account. Nails have long been the go-to option for framing due to their affordability, ease of installation, and ability to withstand shear forces. They are perfect for structural framing projects where fast assembly is essential. In contrast, screws offer exceptional holding power and are particularly useful in situations requiring increased strength and resistance to pull-out forces. For projects that prioritize accuracy and long-lasting quality, screws may be the preferred option, though nails remain a dependable and efficient choice.

The Sawyerville, AL homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.