"They replaced a 10x30 section of my driveway. It looks great, but the framing did not go all the way down and that allowed cement to ooze out. That was not cleaned up."
"Absolutely phenomenal! Luis and his crew were polite, honest, and professional. My husband and I have never experienced working with a contractor before, so we prayed for God to put the right people in our path, and He answered our prayers tremendously. We were clueless about materials and how much things should cost on average, but Luis guided us step-by-step. He and his crew built a second walk-in closet for our master bedroom. The work looks so professional, it looks as if the closet is a part of the house’s original design, very seamless! Part of our back porch was used for the space, and one of the living room windows had to be removed. We’re still in awe of how it looks like a window was never there! We plan on using BetaPro in the near future, and highly, HIGHLY recommend this business to anyone!!"
Wilber Floors is committed to excellence every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and responsibility in all of our jobs. We are a locally owned and operated business with more than 5 years of experience serving AL and surrounding areas. There is no job too big, or too small for our team. Call today and let us put our experience to work for you!\n
"Al was very kind and straightforward. He did initially tried to charge me a little more than the average for the area but after I explained that I had done research for the labor costs and already have materials he got the cost significantly also mention that you found him on Angie's List. I am very pleased with how the floor looks they did a very quick job some very weird layouts because my house is strange though I love its eccentricity. Though it takes a long time to book him because he is usually busy he works very fast, but not sloppily, and the work was completed in approximately 4 days with a small crew of three one of whom was his son. we are almost done with most of our work but I'm a call him back for some minor repairs thing that needs to be completed the only complaint I have is that at least one of the workers is a smoker and I found a few cigarette butts in my yard or in the bushes next to where they were sawing which was not very pleasant. That is a minor complaint though because as contractors go they show up on time and they get the work done and they get the work done well; which, I don't know if you use very many contractors, is unusual and a good thing. Overall I would use them again in a heartbeat and I would suggest them to other people. "
"From the estimate we received to the finished product everything went smoothly and turned out exactly as I wanted. Would definitely recommend and use again."
"Great. I had this work done just over a year ago (should have submitted review sooner). Estimate. Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote. There were some material issues that I'll note below. At no time did the final cost change. Timeline. Installation began about a month or so after I accepted the quote and paid half down for material. I think Charile was ready in about 2 weeks, but I had business travel. Working together to find a common acceptable period for installation was easy. Installation. The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition. Following that, there were 2 full time workers on site. They worked long hours, well over 8 hour days. Normall, the job would have taken about a week. I'll give more detail on the one issue below that drew the task out longer. The guys were good about taking care not to impact the rest of the house (carpet, etc.). After install, they did a good job cleaning up. During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc. The crew provided options and good advice (I'm no kind of interior decorator). The part of the service was excellent. Quality. I have done basic carpentry and electrical work. I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall." The work that you can see is excellent. Material. I was a little worried about the material used for the walls as opposed to tile. I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door. Only issue. The base received was not the correct one. The second base received had a quality issue. They guys pointed this out to me. I'm sure it cost them money out of their pocket / profit to spend the extra time on site. My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time! Things happen. The question is how well does your contractor support you. While I wasn't crazy about the delay (about 3 days, not major for me). I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part. Overall job outcome. I feel what was quoted was provided. Very satisfied. 1 year review ... I remain satisfied. I have had zero issues. Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation). Is the biggest maintenance job. Caring for the bath itself has required average to minimal effort. Give Dream Bath / Charlie a call before you have your bathroom remodeled! "
Backsplash Installation questions, answered by experts
Yes, you can tile a shower as a DIY project, and you can save hundreds of dollars in labor costs by doing so. However, you’ll need to rent or buy quite a few tools and supplies for the job, including a saw, tile nippers, and a new shower pan. In terms of the work itself, you should be prepared to tackle a variety of different tasks, including measuring and ordering materials, removing old tile, waterproofing the wall, adding rows of tile, grouting, and more.
A quality shower tiling project is a bathroom upgrade that can increase resale value. Bathroom remodels have the highest return on investments for any home update. Tiling a shower won’t offer the potential 70% ROI that a full bathroom remodel involving upgrading fixtures, installing storage, and a complete room retile will. However, you can expect an average return of 55% to 60% for this refresh.
Impact, water infiltration, or shifting subfloors often cause damage. Regular inspections help prevent significant issues.
Many homeowners have successfully retiled a bathroom themselves. It can be a challenging but rewarding process, but it’s best for someone who already has at least intermediate DIY skills.
You can, in theory, tile your fireplace hearth with most tiles. However just because you can, doesn’t mean you should. For example, it’s much better to use unglazed tiles because glazed tiles are more resistant to cracking under extreme heat. Porcelain is more heat-resistant than ceramic, but you can still design the hearth as you like by putting the most heat-resistant tiles directly under the fire and, if it matches your style, add more decorative tiles further from the center of the fire.
The Bear Creek, AL homeowners’ guide to backsplash installation services
From average costs to expert advice, get all the answers you need to get your job done.