"I am very happy of work that was done today. I had to install backsplash in my kitchen. Work was done professionally!!!!! Bill has a lot of experience! He did excellent job! Very respectful to the property, he left my house spotless and with a beautiful backsplash!!!!! Definitely will hire him again!!!!"
Wilber Floors is committed to excellence every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and responsibility in all of our jobs. We are a locally owned and operated business with more than 5 years of experience serving AL and surrounding areas. There is no job too big, or too small for our team. Call today and let us put our experience to work for you!\n
Future Builders LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.
"Great. I had this work done just over a year ago (should have submitted review sooner). Estimate. Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote. There were some material issues that I'll note below. At no time did the final cost change. Timeline. Installation began about a month or so after I accepted the quote and paid half down for material. I think Charile was ready in about 2 weeks, but I had business travel. Working together to find a common acceptable period for installation was easy. Installation. The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition. Following that, there were 2 full time workers on site. They worked long hours, well over 8 hour days. Normall, the job would have taken about a week. I'll give more detail on the one issue below that drew the task out longer. The guys were good about taking care not to impact the rest of the house (carpet, etc.). After install, they did a good job cleaning up. During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc. The crew provided options and good advice (I'm no kind of interior decorator). The part of the service was excellent. Quality. I have done basic carpentry and electrical work. I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall." The work that you can see is excellent. Material. I was a little worried about the material used for the walls as opposed to tile. I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door. Only issue. The base received was not the correct one. The second base received had a quality issue. They guys pointed this out to me. I'm sure it cost them money out of their pocket / profit to spend the extra time on site. My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time! Things happen. The question is how well does your contractor support you. While I wasn't crazy about the delay (about 3 days, not major for me). I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part. Overall job outcome. I feel what was quoted was provided. Very satisfied. 1 year review ... I remain satisfied. I have had zero issues. Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation). Is the biggest maintenance job. Caring for the bath itself has required average to minimal effort. Give Dream Bath / Charlie a call before you have your bathroom remodeled! "
"Dearman construction did not disappoint! Very punctual! By far the best customer service and their experience and knowledge of the job requested was outstanding, if you need ANYTHING done from roofing, decking to tile Dearman Construction are the people to go to! Would recommend this business to anyone looking for top notch contractors. Would refer these people to my own family!"
Backsplash Installation questions, answered by experts
The number of boxes of tile you need depends entirely on the amount of tile in each box or case. Different manufacturers package their tiles differently, and boxes contain different amounts of tile depending on the size, shape, and material. Often, the amount of area that a case will cover is listed in the product description. To calculate the number of boxes you need, take the total square feet of the space and divide it by the number of square feet the box will cover.
Removing old tiles can be more complicated, but it can also be more manageable, depending on your circumstances. Typically, old tile is hard to remove because the adhesive had loads of time to bond with your wall, becoming a formidable foe between you and your new tile installation project. On the other hand, old tile in high-traffic areas can become loose, making it much easier to remove.
The choice of whether to tile or use an acrylic tub surround is up to you and can be based on a number of factors, including aesthetics, cost, waterproofing, ease of cleaning, and maintenance.
Tile is a beautiful, classic bathtub surround choice; while tile installation cost is higher, it’s customizable and offers visual appeal. Tile is also harder to clean and presents waterproofing problems because of grout lines. Acrylic surrounds can be more affordable, don’t require much maintenance, and are easier to clean. However, they aren’t usually as visually appealing and may need to be replaced if they become damaged.
No, you don’t technically need a cement backer board for a wall tiling project, but not using it risks disastrous moisture damage. Cement is naturally water-resistant, whereas drywall soaks it in, which can lead to warping or mold growth. Always use a backer board treated with a waterproof membrane for bathrooms and other chronically damp areas to ensure complete tile shower waterproofing.
You can technically install tile over tile, but we don’t suggest it. Installing tile over any surface that isn’t a completely flat and prepared subfloor will result in a shoddy overall job, uneven flooring, tiles that don’t adhere, extra weight, gaps, cracks, and room for moisture and dirt to enter. For the best results, only install new tile on a flat, sanded surface like subflooring or concrete that is prepared for tile.
If you have asbestos tile and would rather tile over it than remove it, or if your existing tile is completely flat and bonded tightly to the floor, you may be able to tile over existing tile. But experts recommend thinking twice before you do.
The Bankston, AL homeowners’ guide to backsplash installation services
From average costs to expert advice, get all the answers you need to get your job done.
When installing a kitchen backsplash, you’ll need the right tools, materials, and knowledge. Our guide will show you how to install a kitchen backsplash.