"I am very happy of work that was done today. I had to install backsplash in my kitchen. Work was done professionally!!!!! Bill has a lot of experience! He did excellent job! Very respectful to the property, he left my house spotless and with a beautiful backsplash!!!!! Definitely will hire him again!!!!"
Wilber Floors is committed to excellence every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and responsibility in all of our jobs. We are a locally owned and operated business with more than 5 years of experience serving AL and surrounding areas. There is no job too big, or too small for our team. Call today and let us put our experience to work for you!
\n
Future Builders LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.
"Great. I had this work done just over a year ago (should have submitted review sooner). Estimate. Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote. There were some material issues that I'll note below. At no time did the final cost change. Timeline. Installation began about a month or so after I accepted the quote and paid half down for material. I think Charile was ready in about 2 weeks, but I had business travel. Working together to find a common acceptable period for installation was easy. Installation. The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition. Following that, there were 2 full time workers on site. They worked long hours, well over 8 hour days. Normall, the job would have taken about a week. I'll give more detail on the one issue below that drew the task out longer. The guys were good about taking care not to impact the rest of the house (carpet, etc.). After install, they did a good job cleaning up. During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc. The crew provided options and good advice (I'm no kind of interior decorator). The part of the service was excellent. Quality. I have done basic carpentry and electrical work. I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall." The work that you can see is excellent. Material. I was a little worried about the material used for the walls as opposed to tile. I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door. Only issue. The base received was not the correct one. The second base received had a quality issue. They guys pointed this out to me. I'm sure it cost them money out of their pocket / profit to spend the extra time on site. My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time! Things happen. The question is how well does your contractor support you. While I wasn't crazy about the delay (about 3 days, not major for me). I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part. Overall job outcome. I feel what was quoted was provided. Very satisfied. 1 year review ... I remain satisfied. I have had zero issues. Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation). Is the biggest maintenance job. Caring for the bath itself has required average to minimal effort. Give Dream Bath / Charlie a call before you have your bathroom remodeled! "
"Dearman construction did not disappoint! Very punctual! By far the best customer service and their experience and knowledge of the job requested was outstanding, if you need ANYTHING done from roofing, decking to tile Dearman Construction are the people to go to! Would recommend this business to anyone looking for top notch contractors. Would refer these people to my own family!"
For professional labor and materials, it would cost between $6,000 and $28,000 to install 1,000 square feet of Saltillo tile flooring. If that’s out of your budget, you could consider laying the tiles yourself or choosing a less expensive type of flooring. For example, vinyl flooring costs just $2 to $7 per square foot, so for a 1,000-square-foot space, you’d pay $2,000 to $7,000.
Phone jack installation can be a complicated project that requires cutting holes into just the right location in the wall and running delicate wiring. This sort of job is best left to the professionals.
Generally speaking, it is better to cut tile wet when using a fast-moving wet saw to reduce dust and chipping. However, tile can be cut dry when using just about any cutting tool. Dry cutting will result in a bigger mess and may increase the risk of chipping or cracking, but if you’re just making small cuts, dry cutting is a safe and viable option. Cutting dry also means you can apply tile grout sooner, so it’s better for rushed projects.
Common problems include cracks, loose tiles, and grout discoloration. Proper maintenance prevents many issues.
Tiling can be DIY with the right tools and skills, but challenges like ensuring evenness and appropriate adhesion often warrant professional handling.
The Bankston, AL homeowners’ guide to backsplash installation services
From average costs to expert advice, get all the answers you need to get your job done.
When installing a kitchen backsplash, you’ll need the right tools, materials, and knowledge. Our guide will show you how to install a kitchen backsplash.