Install Above Ground Pools questions, answered by experts

The best time to schedule an annual pool inspection is early or late spring, before the busy summer season. Your inspector can identify urgent issues so you can address them before using the pool. If your region is warm year-round, schedule an inspection before you start swimming regularly. 

There are three types of pool filters—cartridge, sand, and D.E. (diatomaceous earth). Cartridge and sand filters are the most popular types and are affordable and easy to maintain. D.E. filters are more expensive and require more maintenance, but they are also very good at filtering out small particles.

An above-ground pool with a deck can increase your home's value by as much as 4% to 7%, but it depends on your local climate, potential buyers, and the size and condition of your pool. Some buyers see a pool as a liability instead of a luxury, especially if it's at the end of its life span. In general, it's best to add a pool and deck to your property if it will bring you enjoyment—not because it raises the value of your home.

How often you should add water to your pool depends on how quickly the water evaporates. Keep an eye on your skimmer box, if you have one. Top up the water in your pool if you notice the water levels are lower than the bottom third of your skimmer. This helps prevent damage to your pump. 

Replace all the water in your pool every five to seven years, depending on how often you use your pool, the weather, and whether or not you close your pool for the winter.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Gary, WV homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.