Top-rated subcontractors.

Get matched with top subcontractors in Follansbee, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Follansbee, WV?

Select your specific project to find the pro for you.

TRUSTED BY FOLLANSBEE, WV HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon299
    Verified subcontracting services reviews

Find Subcontractors in Follansbee

Avatar for Speedy contracting service (scs)
Speedy contracting service (scs)
5.0(
18
)

Serving Follansbee, WV and surrounding areas

"I had a big mess of a sewer pipe backed up bc of a blockage in the pipe a Mike showed up as soon as I contacted him a got the job done ! Couldn’t be happier with his service he has done quite a few jobs for me an always has done more then what he had too ! So thanks again Mike you will always be my go to guy !"
Custom bed frame
Entry door repair.
Remodeling - General Project
Fencing Project
Custom bed frame

+12

Recommended by100%of homeowners
Avatar for By All Means & More
By All Means & More
4.4(
75
)

Serving Follansbee, WV and surrounding areas

In business since 2010

Free estimates

"I was a little weiry about going with another contractor in the first place,because I have been taken before. But I went ahead anyway and searched and found By all Means and More..... I called Chris and spoke with him about multiple projects I had and been wanting done for a year or so..... The experience was great when we met on are appointment.... Everything he said was going to take place and how it was going to go it did!.... The guys had a few hicups here and there but they figured it out with no problems.....Everything looks great...."
Pool deck
Deck
Second level deck
Deck
Siding

+47

Recommended by89%of homeowners
Avatar for W.H.A.S. Renovations
W.H.A.S. Renovations
4.7(
12
)

Serving Follansbee, WV and surrounding areas

Free estimates

Credit card accepted

"I really can't say enough about Bob & Dustin. Bob is the Son in William Harris & Son and his professionalism, integrity & skills as a contractor are unsurpassed! I am so thankful that I found him and his company because although this project encountered hiccups, Bob not only made it right but saved me more money and headaches in the future. I have other home projects that need attention and I'm more than comfortable hiring WHAS to tackle this for me. I know the work will be done right & for the best price. WHAS has another customer for life now! BTW, WHAS honors military service, so hire them today!"
Laminate flooring
Wallpaper removal, drywall and electric
Flooring Sales and Installation Project
Gutters and insulation
Laminate flooring

+122

Recommended by90%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Follansbee, WV and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Howard Home Improvement
Howard Home Improvement
4.0(
10
)

Serving Follansbee, WV and surrounding areas

In business since 2016

Free estimates

"Don and is a true professional in his work ethic and a person who would go to great length to accommodate his customer(s). he was diligent and made certain we were perfectly satisfied with his workmanship. We plan to have more work done at our residence, and will contact Don for that work."
Response time2 days
Recommended by100%of homeowners
Showing 1-10 of 28
Subcontractors questions, answered by experts

Custom homes can take an average of 18 months to build, mainly due to the lengthy design process, and most projects take somewhere between 12 and 24 months. When you work with the right custom home builders near you, they can help you map the road ahead and understand what can speed up or delay the timeline. Choosing locally available materials, for example, can speed things up without losing that customized touch.

Regular meetings, reviewing drafts, and providing input on materials help align the project with your vision.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The most common scale for residential blueprints is 1/4 of an inch equals one foot. This scale is the most popular because it’s easier for everyone involved, from professionals to homeowners, to understand the building’s actual dimensions. Also, it allows blueprints to have the necessary details without cluttering the page.

The best way to start designing a house is to know what you want before designing. Making a list of your biggest priorities in a home will help. Designing a house without an idea of what you need or want in a home will lead to many trials and errors that could make it harder to figure out what you need in your design.

The Follansbee, WV homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.