Top-rated above ground pool installation pros.

Best above ground pool installation pros near Davis, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Davis, WV?

Select your specific project to find the pro for you.

Top-Rated Above ground pool installation pros in Davis - Updated Nov 2026

POOLTIME INDUSTRIES LLC
New to Angi
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Davis, WV and surrounding areas

In business since 2019

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job. Call us today.

Gordon's Painting
0.0(
2
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Davis, WV and surrounding areas

In business since 2007

Free estimates

Warranties offered

At Gordon's Painting we pride ourselves on exceeding customers' and clients' expectations. We take the time to really listen and understand your desires; we make sure you are fully satisfied with the job. Call us today; you'll be pleased you did. Thank you.

Recommended by100%of homeowners
Install Above Ground Pools FAQs, answered by experts

While you shouldn’t notice water that has an appropriate amount of chlorine in it (less than 4 parts per million), you could feel sick from drinking overly chlorinated water. Chlorine exposure can cause nausea, vomiting, coughing, and dizziness. Chronic chlorine exposure (meaning multiple or repeated instances) can make you feel like you have the flu, according to the CDC.

You shouldn’t swim in a pool with algae. When there’s algae, there’s also bacteria that’s feeding on the algae. Also, algae-infested pool water is often chemically imbalanced, which means germs like Cryptosporidium, Giardia, and E.coli could be present. These germs can cause a range of illnesses from gastrointestinal issues, to rashes, and respiratory problems.

The best thing to do is to get rid of the algae first, test and balance the water, and then you can enjoy swimming without any worries.

Calcium hypochlorite, or cal-hypo, tends to be the best shock for an above ground pool. It is widely available, affordable, and powerful. Cal-hypo shock is typically 65% to 75% chlorine and is very effective at ridding a pool of bacteria or other contaminants.

A pool heater is worth the expense, given that it can extend your swimming season by several months, depending on where you live. For many, adding a pool heater allows the pool to remain in service from May through mid-October. Even temperatures in the 40s and 50s are tolerable when the water in the pool is heated.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Davis, WV homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.