Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Junior, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Junior, WV?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Junior

POOLTIME INDUSTRIES LLC
New to Angi
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Junior, WV and surrounding areas

In business since 2019

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job. Call us today.

Gordon's Painting
0.0(
2
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Junior, WV and surrounding areas

In business since 2007

Free estimates

Warranties offered

At Gordon's Painting we pride ourselves on exceeding customers' and clients' expectations. We take the time to really listen and understand your desires; we make sure you are fully satisfied with the job. Call us today; you'll be pleased you did. Thank you.

Recommended by100%of homeowners
Install Above Ground Pools questions, answered by experts

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Yes, small pool leaks are fixable with waterproof patches and sealants. It is always best to avoid draining a pool if you can, since doing so safely takes time, patience, and a whole lot of water to refill it. Larger pool leaks may require draining, but in this case, it's best to call in a professional.

Above-ground pools offer affordability, easier installation, portability, and flexibility in placement compared to permanent in-ground pools.

An in-ground concrete pool will carry the highest price tag of all available types of pools, with architectural or freeform concrete pools found at the top end of the price range. Although the upfront costs for a concrete pool are high, these pools tend to be more durable than pools made from other materials and will last the longest. 

Pavers are a great decking option for pools. They’re customizable, come in a variety of shapes, sizes, colors, textures, materials, and price points, and they’re slip-resistant. Concrete pool decks, on the other hand, are harder to repair and replace if damaged and aren’t as slip-resistant as most paver materials. However, not all pavers are equal in terms of durability, maintenance, and performance. Pavers also have their own cons that may encourage homeowners to opt for stamped concrete instead, such as higher upfront costs.

The Junior, WV homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.