Top-rated basement remodelers.

Get matched with top basement remodelers in Cheat Lake, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Cheat Lake, WV?

Select your specific project to find the pro for you.

TRUSTED BY CHEAT LAKE, WV HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon21
    Verified basement remodels reviews

Find Basement remodelers in Cheat Lake

Kinsley Construction Inc
4.8(
139
)
Basement - Remodel

Serving Cheat Lake, WV and surrounding areas

Approved

In business since 1985

Free estimates

Customers say: True professional

"Highly recommended. His bery honest good communicator. kept communicating with us. Make sure his schedule fits to us. High quality of people. they did a good job cleaning up and installation. Very pleasant to the eyes. Very experience roofer. High quality provider. His really a good guy."
Response time2 days
Response rate100%
Recommended by97%of homeowners
Avatar for Barclay Construction, LLC
Barclay Construction, LLC
4.7(
86
)
Basement - Remodel

Serving Cheat Lake, WV and surrounding areas

Approved

Super Service Award Winner

In business since 2018

Free estimates

Emergency services offered

"I was in a sticky situation. My contractor was unprofessional and was overcharging. John stepped in and worked out a reasonable price. His worker Aaron was respectful and lovely to deal with. I live a little far from Morgantown WV. It was part of the contract for me to always be second, but the job got done. I would recommend. John and Arron were very nice to work with"
Newly Painted door and trim
New stained stairs
NEW EPOXY FLOORS
New paint on house
New Stain on deck

+15

Response time1 day
5 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for Eagle Construction LLC
Eagle Construction LLC
5.0(
15
)
Basement - Remodel

Serving Cheat Lake, WV and surrounding areas

Approved

In business since 2022

Free estimates

Small jobs welcome

"Very honest/respectful and reliable service. Was always on time and hard working. Always kept you posted on a daily basis or more on what was going on with the renovations/remodel."
Response time7 hrs
Response rate99%
4 neighbors recently requested a quote
Avatar for Red Ridge Contracting, LLC
Red Ridge Contracting, LLC
5.0(
7
)
Basement - Remodel

Serving Cheat Lake, WV and surrounding areas

Approved

In business since 2024

Free estimates

Emergency services offered

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction, from the start to the completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.\n

Response time1 day
Avatar for Robert Cowell & Sons
Robert Cowell & Sons
5.0(
3
)
Basement - Remodel

Serving Cheat Lake, WV and surrounding areas

In business since 2019

Free estimates

"Robert Cowell and sons did a complete overhaul and remodel to kitchen. This even included changing the layout from what the cabinet company had designed and has worked out great for my family. Our kitchen is a definite statement piece, as people walk in the house and one of the first comments we here. Would definitely hire again and plan to, for other upcoming home projects."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+33

Recommended by100%of homeowners
Avatar for Muirs General Contracting llc
Muirs General Contracting llc
5.0(
4
)
Basement - Remodel

Serving Cheat Lake, WV and surrounding areas

In business since 2018

Free estimates

Emergency services offered

"Gary and his crew never failed my job here needing done everything was fixed secured and more secure then it ever was before, Very flexible scheduling and the job was completed from start to finish and with that I'm very pleased with the work and the cost and the work was done just like I ask it to be very satisfied and will hire Mr Muir for some other things I need to getting done in the near future"
Prep
Deck extension, smoke shack roof build, house rot replaced
Basement remodel
Drop ceiling
Roof replaced + new A frame roof install

+376

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Cheat Lake, WV and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 28
Basement Remodel questions, answered by experts

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

In many homes, an unfinished basement is an ideal place for an in-ground pool. The concrete floors, protection against water damage, and access to the ground below your home make this a large contender. Speak with a local basement remodeling contractor to ensure your space is right for the large construction.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

If you have the woodworking experience to build a bar from scratch and you have the time, DIYing the work is a no-brainer and can save a few thousand dollars. However, if you’re looking to include a sink, additional lighting fixtures, or high-end bar tops and cabinets, it’s usually a better idea to call in a pro. It will cost more, but the finished product will likely be worth it.

The Cheat Lake, WV homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.