Top-rated asphalt driveway pros.

Best asphalt driveway pros near Boliva, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Boliva, WV?

Select your specific project to find the pro for you.

TRUSTED BY BOLIVA, WV HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon51
    Verified asphalt driveway services reviews

Top-Rated Asphalt driveway pros in Boliva - Updated Nov 2026

Avatar for JD & Sons Masonry and Concrete
JD & Sons Masonry and Concrete
4.7(
7
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Boliva, WV and surrounding areas

Approved

Customers say: True professional

"Jeff and his crew were great to work with. The porch looks amazing!! They poured footers, built block walls, filled in around the walls, poured and finished the concrete porch and stairs. I would definitely hire them again!!!"
Stone veneer
Concrete flat work
Stone veneer
Concrete flat work
Stone veneer

+34

Response time2 days
Response rate100%
1 neighbors recently requested a quote
...
Showing 1-10 of 93
Asphalt Driveways FAQs, answered by experts

A driveway approach is the part of a driveway where the public road meets the private driveway. This section contains several key elements, including the driveway apron, the curb cut, and the end slope. Depending on the slope of the driveway, this area may also contain the trench drain.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

The driveway apron is a technical term referring to where a private driveway meets the public street. If there is a sidewalk in front of the house, the driveway apron is typically on the opposite side of the public sidewalk from the driveway itself.

The Boliva, WV homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.