Top-rated subcontractors.

Get matched with top subcontractors in Addison, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Addison, WV?

Select your specific project to find the pro for you.

Find Subcontractors in Addison

Avatar for Groundworks
Groundworks
4.2(
86
)

Serving Addison, WV and surrounding areas

Approved (Corporate)

Super Service Award Winner

In business since 2003

Free estimates

Warranties offered

"Michael McAllister with his Poly crew did a great job. Well respectful, timely and job turned out great. Driveway cracks and leveling looks great"
Foundation
Foundation
Foundation
Concrete
Concrete

+15

Response time1 day
75 neighbors recently requested a quote
Recommended by83%of homeowners
Avatar for Alford Foundation and Crawl Space Repair
Alford Foundation and Crawl Space Repair
3.7(
119
)

Serving Addison, WV and surrounding areas

Approved

In business since 1963

Free estimates

Emergency services offered

"This is a wonderful company. They walked me through the whole process and I absolutely loved the crew that came out. Talk about a great bunch of guys, shew! It was an absolute pleasure working with this fine group. I have recommended several of my family members to them. Their marketing is also top notch, they sure do know what they are doing! If you want your work done, & done right? Alford is where it is at!"
Encapsulation and Waterproofed Crawl Space
Dirty crawl space with improper lining
CleanSpace Liner and SmarJacks
CleanSpace Liner
Dirty, vented crawl space

+5

Response time1 day
110 neighbors recently requested a quote
Recommended by80%of homeowners
Avatar for Sentri Homes
Sentri Homes
2.3(
21
)

Serving Addison, WV and surrounding areas

Approved

In business since 2023

Free estimates

Emergency services offered

"Jose and crew were timely, conscientious, great communicator, hard-working and tidy. They treated my little 1940 cabin in the desert like a brand new home. They worked with the materials I supplied and it was very enjoyable listening to them enjoying their work. I would highly recommend them.!"
29 neighbors recently requested a quote
Avatar for North Alabama Technical Services
North Alabama Technical Services
4.9(
124
)

Serving Addison, WV and surrounding areas

In business since 2010

Emergency services offered

Credit card accepted

"Jim is local.  It went great. Jim Ferrell is a professional of the highest caliber. Responded quickly, took care of my problems, and advised me as to better means of protection than I had. He came back a second time to uninstall software that I purchased that did not provide adequate protections and installed free software that would do the job.  He did the work through remote connection, but is available on site if necessary.
For those people needing help on getting red of malware, viruses , etc. on your computer,  Jim is local, better than all thse remote out of state location providers, is a mature, highly trained professional in this area.
If you go to local computer stores you get very young people that can do a basic job, but are no where near the professional level of Jim.
I highly recommend Jim to anyone that needs these type services.
"
2014 Super Service Award Winner!
Additional Photos
Recommended by97%of homeowners
...
Showing 1-10 of 68
Subcontractors questions, answered by experts

Yes, professionals will offer tailored solutions to fit architectural and personal style preferences.

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

Yes, modular homes offer a wide range of customization options for layout, finishes, and features.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The Addison, WV homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"