Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Webster, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Webster, WI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Webster

Hip & Ridge Construction
4.5(
6
)

Serving Webster, WI and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"The windows our great! Energy saving due to the insulated glass saves money and never fogs or has condensation on the windows. The durability and ease of cleaning and opening these windows are a dream! Along with the aesthetics.
The crew that came to install the windows did awesome work fast cleaned up there work area things were in great shape when leaving. Since then I have had follow up calls and follow visits to make sure everything is working as I believe it should be which it is. Great company!! Would have them do any work for me and my family and would have them do anyone else's work too. Do not let this company slip by without a try!"
Recommended by100%of homeowners
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

If you’re looking for a similar, eco-friendly driveway material, you might consider one of these options:

  • Permeable pavement: This material is sometimes called “pervious” or “porous” pavement; it allows stormwater to drain into the subbase, eliminating storm drain costs. 

  • Gravel: Consider paving your driveway with locally sourced gravel. By sourcing from a nearby source, your money won’t fund international shipping and will be invested back into your local community.

  • Natural stone pavers: Because natural stone pavers are made from organically-produced stone, there’s no new manufacturing required, limiting the environmental impact. In addition, water easily flows and drains through the gaps in the pavers.

Depending on project size, typically 1 to 3 days, including preparation and installation.

Driveway aprons typically range between four and seven inches thick, though your town's building codes will likely have specific requirements. Additionally, you may need to add a layer of permeable aggregate in the excavation below your paved apron to ensure proper stormwater drainage.

Like all driveway materials, asphalt can crack in the wrong conditions and with age. Many things can cause asphalt to crack, including shifting soil or settling under the foundation. Other common causes are driving oversized vehicles on the asphalt, tree roots, and using rock salt during the snowy season. Proper installation and sealing the driveway every 10 years can help prevent cracks.

The Webster, WI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"