Top-rated subcontractors.

Get matched with top subcontractors in Strum, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Strum, WI?

Select your specific project to find the pro for you.

TRUSTED BY STRUM, WI HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon42
    Verified subcontracting services reviews

Find Subcontractors in Strum

Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Strum, WI and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Strum, WI and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Right Choice Construction LLC
Right Choice Construction LLC
3.8(
29
)
Major Home Repairs (General Contractor)

Serving Strum, WI and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"The whole process went smoothly. Product was available within estimate dates. Scheduling occurred per our needs. The removal of exiting tub/shower and installation of new shower was completed in one day. Shower looks great. Everyone involved was extremely friendly. Installation team installed all accessories after consulting with us on locations. Great Job all around. We are now engaged with the company to replace our upper floor windows later this year."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

Recommended by90%of homeowners
Avatar for Above and Beyond Construction llc
Above and Beyond Construction llc
5.0(
2
)
Major Home Repairs (General Contractor)

Serving Strum, WI and surrounding areas

In business since 2013

Free estimates

Emergency services offered

"I liked them. They were very good. Matthew was a very nice pleasant guy. He answered his phone promptly. He has a good crew working with him. He was a very nice person. He did not make me wait. I was very satisfied with them. He did an excellent work."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Recommended by100%of homeowners
Showing 1-10 of 19
Subcontractors questions, answered by experts

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

Aging-in-place universal design features can make your home more comfortable for family members who are older or have disabilities; they can also make your home safer. In addition, adding a universal-design bathroom can boost your home’s overall resale value.

Structural engineers draw structural plans, which include detailed drawings of the structural components of a home only. Complete house plans will require additional work from an architect or draftsperson, whose drawings will take the structural drawings into account. They’ll also include more details about the finishing materials and layout of a home, including everything from roofing and flooring materials to the position of furniture, light fixtures, switches, and plumbing fixtures.

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

Yes, professionals can offer design advice and material selections that complement existing architecture.

The Strum, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.