Top-rated excavation pros.

Get matched with top excavation pros in Rib Mountain, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Rib Mountain, WI?

Select your specific project to find the pro for you.

Find Excavation pros in Rib Mountain

Avatar for Central Wisconsin Excavating
Central Wisconsin Excavating
5.0(
12
)
Landscape - Minor Grading or Resloping

Serving Rib Mountain, WI and surrounding areas

Approved

Free estimates

Emergency services offered

Small jobs welcome

"Central Wisconsin Excavating (CWE) did a fantastic job on our project. They built a solid, well-prepared foundation for our 80,000-bushel grain bin and graded our driveways perfectly to ensure water drains away from our buildings. Their attention to detail, quality of work, and professionalism really stood out. The site was left clean and properly finished, and everything was done right the first time. We’re extremely happy with the results and would highly recommend CWE to anyone needing excavation or site work done right."
Pond project
Pond project
Avatar for Scott Brandt Mini Excavation And Demo LLC
Scott Brandt Mini Excavation And Demo LLC
5.0(
9
)
Landscape - Minor Grading or ReslopingExcavation - Major Grading or Resloping - For Business

Serving Rib Mountain, WI and surrounding areas

Approved

In business since 2024

Free estimates

Emergency services offered

"I had some landscaping done around my house after refinishing the foundation. Scott was very professional and pleasant to work with. The work was done within the time specified and the results were just what I asked for. Very reasonably priced for the work that he did. Would definitely recommend to anyone."
Driveway
Demo
Dirt moving
Mulch
Mulch

+6

3 neighbors recently requested a quote
Central Wisconsin Excavating
New to Angi
Landscape - Minor Grading or Resloping

Serving Rib Mountain, WI and surrounding areas

Approved

In business since 2018

Free estimates

Credit card accepted

I'm a firefighter and I decided to add more income and work to my background, so i bought an excavator and took off from there. At company , our company is based on the belief that our customers' needs are of the utmost importance. Our team is committed to meeting those needs. We welcome the opportunity to earn your trust and deliver you the best service. No job is too big or too small for our experienced team. Call today for a quote.\n

Avatar for KithTerra Excavating
KithTerra Excavating
5.0(
2
)
Building Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping - For Business

Serving Rib Mountain, WI and surrounding areas

In business since 2025

Free estimates

Credit card accepted

"Customer service was top notch- we started with a 4 acre wooded lot and we had started clearing it ourselves and had many stumps and some more trees to take down. They gave an estimate via photos and email since job site was over an hour away which worked great. Worked til job was finished and did so in a timely manner. We also added clearing a new driveway after the fact and did amazing job. Great communication - would definitely hire again and give referral. Photos are Before and afters."
Spooner land clearing
Spooner land clearing
Clayton land clearing
New Driveway install
New Driveway install

+3

Response time8 hrs
Response rate90%
Showing 1-10 of 40
Excavating questions, answered by experts

Call 811 to locate and mark the gas lines at least three days before digging. In many areas, you can dig within 18 inches of the lines, though in some locations, the distance may be further. Check local regulations, as you may need a utility company representative onsite when digging. Document your calls to 811 and precautions taken to avoid gas lines. A homeowner can be held liable for hitting a gas line in some cases, but contacting the proper authorities and following all guidelines can offer protection.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

A trench that is less than 5 feet deep often doesn't require a protective system. Most residential trenches will not go this deep (the typical residential drainage trench is just 18 inches deep). In the event that an excavator needs to dig more than 5 feet beneath the surface, a protective system is required unless the excavation is in entirely stable rock.

Downspouts should be buried at least 5 to 10 feet away from your foundation. This can vary depending on your local building codes, soil type, and property slope. The main goal is to ensure water is directed away from your foundation.

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

The Rib Mountain, WI homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.