Top-rated basement remodelers.

Get matched with top basement remodelers in Owen, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Owen, WI?

Select your specific project to find the pro for you.

Find Basement remodelers in Owen

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Owen, WI and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Hip & Ridge Construction
4.5(
6
)
Basement - Remodel

Serving Owen, WI and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"The roofers were extremely professional and nice. They found that the previous roofers did not put flashing around the skylights. All of the wood around them was rotten. They had to take all six skylights out to replace the wood. They did it with minimal dust inside. They took the time to put extra ice and snow barriers around the skylights. They went above and beyond. I would recommend Brian and his crew to anyone. Todd from Hip and Ridge Construction is friendly, professional and honest."
Recommended by100%of homeowners
Avatar for Matthew Moss Painting
Matthew Moss Painting
3.7(
3
)
Basement - Remodel

Serving Owen, WI and surrounding areas

In business since 1990

Emergency services offered

Credit card accepted

Interior painting, exterior painting, Log Cabin Staining sheetrock repair, carpentry work, staining, concrete painting, handyman work, pressure washing, corn cobb and walnut shell blasting, cedar roof cleaning and stain & wood floor re-finishing. Additional phone number - (218) 851-4078

Additional Photos
Additional Photos
Before
After
Before

+24

Recommended by66%of homeowners
Showing 1-10 of 13
Basement Remodel questions, answered by experts

Home improvements that increase value offer a high return on investment (ROI) and can enhance your quality of life. Upgrades to your home’s curb appeal often add the most value, with garage door replacement having one of the best ROIs at 93%. Other high-value exterior projects include replacing your front door, upgrading siding and roofing, installing a stone veneer, adding new windows, and landscaping. For interior renovations, a fresh coat of paint provides an excellent ROI. Major projects like a kitchen remodel or upgrading appliances and HVAC systems also add significant value, as potential buyers appreciate the peace of mind that new equipment provides.

Yes, barndominiums can have basements. Barndominiums are typically built over concrete slabs, so barndo basements are not very common. However, it is possible to include a basement in a barndominium blueprint as long as you’re building completely from scratch. Barndos can have the same types of basements as traditional homes, including full or walk-out basements.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

It is common for a contractor to ask for a down payment before starting a project, especially for jobs that require purchasing materials and equipment or hiring a crew. The deposit amount can range from 10% to 50% of the total job cost. While a request for up to 50% is not unusual, a contractor should not ask for more than that, and you should never pay for a project in full before the work has begun. To protect yourself, always discuss payment terms before starting and have a written contract that outlines the project timeline and expectations. Additionally, be sure to hire reputable contractors and check their licensing and insurance before the project begins.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

The Owen, WI homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.