Top-rated basement remodelers.

Get matched with top basement remodelers in Hewitt, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Hewitt, WI?

Select your specific project to find the pro for you.

Find Basement remodelers in Hewitt

Avatar for A&M General Construction LLC
A&M General Construction LLC
4.6(
8
)

Serving Hewitt, WI and surrounding areas

In business since 2021

Free estimates

Emergency services offered

"Antonio remodeled our bathroom with a costum shower along with other little projects throughout the house. I highly recommend him and his crew. Would hire them again."
Roof and windows
Remodeling - Kitchen & Bathroom Project
Remodeling - General Project
Remodeling - General Project
Roof and windows

+25

Response time7 hrs
Response rate100%
Recommended by87%of homeowners
Avatar for MH Home Services LLC
MH Home Services LLC
5.0(
5
)

Serving Hewitt, WI and surrounding areas

In business since 2021

Free estimates

Emergency services offered

"Went very well! Showed up on day/time when it was discussed. Kept my plan/budget in mind when performing the work, but gave professional opinion when necessary. Started & completed project in timely fashion and was charged a very reasonable amount for services. Will hire again & advise anyone to use him for home projects!"
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Hewitt, WI and surrounding areas

In business since 2006

Credit card accepted

"I feel extremely fortunate to have found Vicki through Angie's List !  She is an extremely talented person who is very easy to deal with. She has a breath of knowledge that allows her to accommodate my tastes, but also ensure that the overall design is in sync with the design and location of my home.  She has  a very diplomatic way of suggesting when I'm going astray with my choices and in every case where she has told me "Trust Me"  I have been delighted ! She is very aggressive in helping me find the best pricing and often times will work with the vendors directly  hence saving me the time.  She also has excellent local contacts.  Everyone I've worked with through Vicki has been timely, professional, and highly competent.
My project is far from complete.  I intend to continue to use Vicki and her expert advice until the end !!!!"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Mayotte Investments
Mayotte Investments
5.0(
5
)

Serving Hewitt, WI and surrounding areas

In business since 2023

Free estimates

Emergency services offered

"We've used Mayotte Investments a few times and will most definitely will be "THE FIRST" company we contact or suggest with remodel or building needs. They do the job right even if the right way is harder, but better results. Honest hard working group."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+4

Recommended by100%of homeowners
Hip & Ridge Construction
4.5(
6
)

Serving Hewitt, WI and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"The roofers were extremely professional and nice. They found that the previous roofers did not put flashing around the skylights. All of the wood around them was rotten. They had to take all six skylights out to replace the wood. They did it with minimal dust inside. They took the time to put extra ice and snow barriers around the skylights. They went above and beyond. I would recommend Brian and his crew to anyone. Todd from Hip and Ridge Construction is friendly, professional and honest."
Recommended by100%of homeowners
Showing 1-10 of 19
Basement Remodel questions, answered by experts

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

Efficient appliance positioning, optimizing existing plumbing, and sourcing energy-efficient materials reduce financial impact and increase sustainability.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Renovation enhances functionality, increases home value, and can add new space for personal or family needs. It typically modernizes older unfinished basements for new uses.

The Hewitt, WI homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.