Top-rated basement remodelers.

Get matched with top basement remodelers in Kewaunee, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Kewaunee, WI?

Select your specific project to find the pro for you.

Find Basement remodelers in Kewaunee

Avatar for JC Elevation Team LLC
JC Elevation Team LLC
5.0(
5
)
Basement - Remodel

Serving Kewaunee, WI and surrounding areas

In business since 2021

Free estimates

Warranties offered

"My experience was truly amazing, they over passed my expectations. Nicely done job, I would highly recommend them if you need any type of remodeling. Also, they are bilingual, communication was very good and they were very quickly to finish too."
Painting - Exterior Project
Siding Project
Roofing Project
Painting - Exterior Project
Siding Project

+33

Response time4 days
Response rate100%
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Kewaunee, WI and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Punchlist Pro Services
Punchlist Pro Services
4.8(
9
)
Basement - Remodel

Serving Kewaunee, WI and surrounding areas

In business since 2023

Free estimates

Emergency services offered

"Brent and his team built a half bath in my basement. Very easy to work with and receptive to feedback and ideas to help vision become reality. Quality of work was very good and I would consider his pricing a value for the final product. Would highly recommend and hire him again for any future projects. Tom Hoeft"
Master Bath Remodel
Custom Tile Shower
Vanity Replacement
Bathroom Remodel
Business Bathroom

+19

Response time1 day
Recommended by66%of homeowners
Hip & Ridge Construction
4.5(
6
)
Basement - Remodel

Serving Kewaunee, WI and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"The roofers were extremely professional and nice. They found that the previous roofers did not put flashing around the skylights. All of the wood around them was rotten. They had to take all six skylights out to replace the wood. They did it with minimal dust inside. They took the time to put extra ice and snow barriers around the skylights. They went above and beyond. I would recommend Brian and his crew to anyone. Todd from Hip and Ridge Construction is friendly, professional and honest."
Recommended by100%of homeowners
Showing 1-10 of 17
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.

The average cost to remodel a basement is between $12,100 and $33,400. Depending on the project's complexity, the price can be as low as $3,500 or exceed $50,200. For a simple project like adding a home office, you might spend between $500 and $3,000. However, a more extensive project, such as adding a bathroom, can range from $6,600 to $16,500. The final cost is influenced by factors like the basement's size and condition, the type of remodel, material choices, your location, and accessibility. For an accurate price, it's best to consult with a basement remodeling team.

Renovations that add functionality or more comfortable floor space generally add the most value when remodeling your home. Attic or basement finishing can add floor space without altering the home's structure, saving you renovation money while adding valuable space. Smaller improvements, such as installing smart-home components or replacing entry doors and windows, also experience high ROIs. 

The Kewaunee, WI homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.