Top-rated cabinet contractors.

Get matched with top cabinet contractors in Custer, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your cabinet contracting project in Custer, WI?

Select your specific project to find the pro for you.

Find Cabinet contractors in Custer

Avatar for Kitchen Tune-Up Stevens Point, WI
Kitchen Tune-Up Stevens Point, WI
4.8(
5
)
Cabinets - Reface

Serving Custer, WI and surrounding areas

Approved

In business since 2019

Free estimates

Warranties offered

"Overall they did a good job. They could have paid more attention to details and caulking. I had to have them come back a couple times. A year later when caulking shrunk again it was hard to get in touch with someone. It was nice to have the whole job done within a week."
Before Repainting
Before Tiling
After Repainting
After Tiling!
Before Repainting

+16

Response time1 day
Response rate95%
1 neighbors recently requested a quote
Al Reed Builders, LLC
1.0(
2
)
Custom Cabinets - BuildPre-Made Cabinets - Install

Serving Custer, WI and surrounding areas

Approved

In business since 1994

Free estimates

Credit card accepted

Al Reed Builders, LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customer's interests, and make their concerns the basis of our business.

Recommended by100%of homeowners
Showing 1-10 of 41
Cabinet Contractors questions, answered by experts

Whether you install flooring before or after kitchen cabinets depends primarily on the type of flooring you are using. For materials like hardwood, tile, and sheet flooring, the best practice is to install the flooring first. This ensures the cabinets are installed at the correct height and on a stable surface. However, you should not install cabinets on top of floating floors, such as laminate or luxury vinyl plank (LVP). These types of flooring need room to expand and contract with temperature and humidity changes. Placing heavy cabinets on top can restrict this movement, potentially causing the floor to buckle and making the cabinets unstable. For floating floors, install the cabinets first and then lay the flooring up to them. Other reasons to consider installing cabinets before the flooring include saving money on materials (since you won't need flooring under the cabinets) and avoiding potential damage to your new floor during cabinet installation. Additionally, installing cabinets directly on the subfloor might prevent voiding your flooring's warranty.

While a three-inch center-to-center handle is common, there’s no guarantee that sizing will be the same for every cabinet. Different types of handles have different sized holes to attach them and there are lots of different cabinet handle widths and styles. You should measure to be sure you know the size of a handle and to avoid surprises.

DIY is possible, but professional assembly ensures proper alignment, stability, and cable management.

Installation typically takes 2-3 days, depending on the kitchen size and preparation needed.

The depth of your pantry shelves should range between 12 and 24 inches, depending on how high it sits on the wall and your pantry size. Higher shelves should fall on the thinner side since it is harder to reach deep shelving areas the higher you go.

The Custer, WI homeowners’ guide to cabinet contracting

From average costs to expert advice, get all the answers you need to get your job done.