Top-rated stucco pros.

Get matched with top stucco pros in Clinton, WA

Enter your zip and get matched with up to 5 pros

Find Stucco pros in Clinton

Avatar for Villalobos Construction LLC
Villalobos Construction LLC
5.0(
14
)
Traditional Stucco - Repair or Partially ReplaceTraditional Stucco - Install or Completely ReplaceSynthetic Stucco - Install or Completely Replace+4 more

Serving Clinton, WA and surrounding areas

Approved

Super Service Award Winner

In business since 2023

Free estimates

Credit card accepted

"Good communication, started on time, finished on time. Did quality work, communicated well about conditions discovered under stucco (existing rot) and repaired that. Finished stucco was an excellent match to existing. Caulking was very well done. Did a good job with site protection and cleanup, and kept a tidy work site. Great work all around."
Response time6 hrs
Response rate97%
20 neighbors recently requested a quote
Palm Construction and Remodeling, Inc.
5.0(
118
)
Synthetic Stucco - Install or Completely ReplaceSynthetic Stucco - Install or Completely Replace- For BusinessSynthetic Stucco - Repair or Partially Replace- For Business+4 more

Serving Clinton, WA and surrounding areas

In business since 2020

Free estimates

Offers commercial services

It can be a daunting task looking for not only the right contractor for your job but also the right contractor for you. We completely understand what you're going through. We know every customer has different desires, different needs and different schedules. We're not only here to turn your ideas into reality but to make it a memorable experience every step of the way. Call us right now, no matter where you are in the planning process.

Response time3 days
Eco Star Remodeling & Construction
4.8(
143
)
Synthetic Stucco - Install or Completely ReplaceSynthetic Stucco - Install or Completely Replace- For BusinessSynthetic Stucco - Repair or Partially Replace- For Business+4 more

Serving Clinton, WA and surrounding areas

In business since 2022

Free estimates

Credit card accepted

"The team completely renovated our kitchen. From layout to cabinets and countertops, everything was installed with precision. Cooking and entertaining have become so much more enjoyable."
Response time2 days
Recommended by3%of homeowners
Avatar for Honeycomb Construction
Honeycomb Construction
4.8(
40
)
Synthetic Stucco - Install or Completely ReplaceSynthetic Stucco - Install or Completely Replace- For BusinessSynthetic Stucco - Repair or Partially Replace- For Business+4 more

Serving Clinton, WA and surrounding areas

In business since 2019

Free estimates

"I was recently seeking a contractor on Angi for an urgent interior paint project at my home with quick turnaround time. This bedroom paint project included wall paint (2 colors; 1 accent wall), wall baseboard trim repair + paint, door trim repair + paint, door paint, and a plumbing panel replacement + paint. When I posted the request on Angi, Eugene from Honeycomb Construction called me within a minute after posting (Wow!). I explained my situation (baby on the way/arriving in weeks, nesting) and project details, and Eugene stopped by the same day to get a good look at room needing paint + repairs. Eugene was able to meet my familyâ s needs to get this room ready within one week. Although the estimated job timeline slid out by one day due to factors out of Eugeneâ s control (cold room on the basement floor, so paint takes longer to dry between coats), he did an excellent job with all the promised work: the paints of coat were even and full, the lines between the two colors of paint were crisp and clean, and the baseboard trim was looking sharp! Eugene does great work, heâ s really responsive and communicative throughout the process, heâ s really professional, and he is very kind. I will be hiring Eugene and Honeycomb Construction again for future home projects. Thank you!"
exterior
exterior
exterior
exterior
exterior

+32

Response time1 day
Response rate86%
Recommended by97%of homeowners
Palm Construction and Remodeling Inc.
4.2(
88
)
Synthetic Stucco - Install or Completely ReplaceSynthetic Stucco - Install or Completely Replace- For BusinessSynthetic Stucco - Repair or Partially Replace- For Business+4 more

Serving Clinton, WA and surrounding areas

In business since 2020

Free estimates

Offers commercial services

"Palm Construction recently re-roofed my house and did quick and high quality job at very competitive price. They also cleaned working are and it was a true pleasure to work with them. Special thanks to Lee, project manager. He was professional, honest and helpful."
Response time2 days
Recommended by90%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Synthetic Stucco - Install or Completely ReplaceSynthetic Stucco - Install or Completely Replace- For BusinessSynthetic Stucco - Repair or Partially Replace- For Business+4 more

Serving Clinton, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
Corstone Contractors, LLC
5.0(
2
)
Synthetic Stucco - Install or Completely ReplaceSynthetic Stucco - Install or Completely Replace- For BusinessSynthetic Stucco - Repair or Partially Replace- For Business+4 more

Serving Clinton, WA and surrounding areas

In business since 2000

Free estimates

Offers commercial services

Corstone Contractors is one of Washingtons most trusted construction companies. We've been in business for over 20 years and continue to give homeowners the most exquisite results they've ever had. From basic drywall installations to full blown home builds, we specialize in anything construction. Give us a call and find out why we have been in business for over 2 decades!\n

Recommended by100%of homeowners
gabohomerenovations
New to Angi
Synthetic Stucco - Install or Completely ReplaceSynthetic Stucco - Install or Completely Replace- For BusinessSynthetic Stucco - Repair or Partially Replace- For Business+4 more

Serving Clinton, WA and surrounding areas

In business since 2017

Free estimates

Credit card accepted

JC Plaster & Stucco, LLC is a locally owned and operated company that values honesty and integrity in all aspects of our business. Our dedicated team of professionals have over 18 years of hands on experience, to provide innovative ideas and suggestions tailored to your projects. Our services are customized to your individual needs, paying close attention to the details of each project that we are involved with. Please feel free to contact us today!

Showing 1-10 of 26
Stucco questions, answered by experts

The best exterior paint finish for stucco is a flat or low-gloss finish. A high-gloss finish will show imperfections in the stucco and give it a candy-coated look that many homeowners don’t like. The best types of exterior paint to use on stucco are acrylic, masonry, and elastomeric. However, acrylic is recommended because it is both durable and breathable.

The length of time shouldn’t matter much if you stick with lightweight Christmas lights and similar decorations. Those shouldn’t pose risks to your stucco. You should avoid attaching anything to your stucco that could fall because it’s too heavy, which may take part of the stucco with it. Some methods, like using double-sided tape or adhesive hooks, will naturally wear out over time and lead to falling lights, so don’t expect to leave these lights up year-round.

Quikrete will set without mixing. The process of pouring dry concrete into your concrete form and then adding water is called dry pouring. While this method makes pouring concrete simpler and easier, it reduces its strength and durability. It can be a viable option for small, decorative concrete pavers for walkways or for setting fence posts, but it’s not ideal for pouring slabs that will bear any significant amount of weight.

Yes, you can screw directly into stucco. Only do so if the item you are installing is a permanent fixture. Drill a pilot hole into the stucco using a masonry or concrete bit, then drive in the screw with a power drill or screwdriver.

The Mediterranean style is unique in that it’s designed for homes in hotter climates and to maintain a connection with nature. The building materials include stucco siding, clay roofs, and interior tiling with tall ceilings and open floor plans. These all come together to keep the interior cool. The building materials are all natural and tend to have muted earth tones, and the architecture typically allows for easy, open access to the outdoors through large windows and arched doorways. The decor and architecture can range from simple and functional to opulent, depending on the type of Mediterranean home it is.

The Clinton, WA homeowners’ guide to stucco services

From average costs to expert advice, get all the answers you need to get your job done.