Top-rated home builders.

Best home builders near Brinnon, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your home building project in Brinnon, WA?

Select your specific project to find the pro for you.

Top-Rated Home builders in Brinnon - Updated Nov 2026

Avatar for Elk Valley Construction, LLC
Elk Valley Construction, LLC
5.0(
4
)
Find a Custom Home BuilderFind a Modular Home Builder

Serving Brinnon, WA and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Small jobs welcome

"Dalton and his crew were hired to build a roof over an existing deck and replace a rotting fence. From the get-go, they were professional and hard working. On time and efficient, they kept us informed every step of the way. The result? What seems like a beautiful new porch and yard! We even went on to hire them for an additional project, replacing trim on our home. And the cost? Quite reasonable! We highly recommend Elk Valley Construction, LLC!"
Connie back porch/ fence
Connie back porch/ fence
Connie back porch/ fence
Connie back porch/ fence
Connie back porch/ fence

+8

Response time10 hrs
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Find a Custom Home BuilderFind a Modular Home BuilderShelter or Outbuilding - Build

Serving Brinnon, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
Avatar for 360 BUILDER INC
360 BUILDER INC
5.0(
3
)
Find a Custom Home Builder

Serving Brinnon, WA and surrounding areas

In business since 2023

Free estimates

Warranties offered

"Joe Lewis and his crew are true professionals. They were prompt, thorough and always cleaned up after themselves. They showed up Every morning ready to work. The tile work Joe and Dan did was nothing but true art! He took time to get everything perfect. I would hire this company again and again. So trustworthy."
Response time4 hrs
Recommended by66%of homeowners
Avatar for Christopher & Company
Christopher & Company
4.3(
283
)
Shelter or Outbuilding - Build

Serving Brinnon, WA and surrounding areas

In business since 2009

Free estimates

Credit card accepted

"

Fantastic!  They came in under budget and my wife and I are very, very happy with there work.  I only wish they had been a little quicker to responds on some of our message traffic, but they where always very professional.  I would recommend them immediately for anyone who had some home repair needs.


"
Overall View
Details are Always Important
Custom Made Lattice
Damaged area
Finshed Result

+46

Recommended by87%of homeowners
Avatar for Marketplace Housing
Marketplace Housing
4.3(
11
)
Find a Custom Home BuilderFind a Modular Home Builder

Serving Brinnon, WA and surrounding areas

In business since 2003

Free estimates

Emergency services offered

"Office staff is always available for help. No job is too small or too big. They are responsive to our needs for service requests from roofing to foundations. All aspects of home repairs have been done professionally and in a timely manner. I would recommend Marketplace Homes for all your property management needs regarding property repairs and maintenance."
Recommended by77%of homeowners
Showing 1-10 of 43
Home Building FAQs, answered by experts

Most cottages are around 1,000 square feet, making them smaller than most other styles. However, cottages are defined more by their decor and architectural focus on simplicity, functionality, and a connection to nature than they are by a rigid square footage or floor plan. While cottages are defined more by their charm and appearance than size, the smaller footprint does help maximize the comfort and charm, and it keeps the focus on connection to nature and family.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Modular homes are more affordable than stick-built homes if you keep quality and square footage equal. The cost to build a home averages $323,000, while average modular home prices sit at {AvgCost}. If you’re looking for custom or luxury options, a traditional custom home costs $825,000, while a high-end modular home costs $600,000, on average.

Handypeople usually don’t hold trade licenses, so they typically aren’t qualified to tackle projects involving installing or making alterations to plumbing or electrical lines. Below are some jobs that a handyperson usually won’t be able to complete:

  • Installing plumbing for a new kitchen or bathroom

  • Replacing plumbing pipes

  • Installing or repairing septic systems

  • Running new electrical wiring

  • Installing a subpanel

Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction. 

Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.

The Brinnon, WA homeowners’ guide to home building services

From average costs to expert advice, get all the answers you need to get your job done.