Top-rated home builders.

Best home builders near Grapeview, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your home building project in Grapeview, WA?

Select your specific project to find the pro for you.

TRUSTED BY GRAPEVIEW, WA HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon30
    Verified home building services reviews

Top-Rated Home builders in Grapeview - Updated Nov 2026

Avatar for Framework Construction LLC
Framework Construction LLC
4.8(
5
)
Find a Custom Home Builder

Serving Grapeview, WA and surrounding areas

Approved

In business since 2022

Free estimates

Warranties offered

We pride our company on reliability, great communication, integrity, and quality work. We are experts in our trade and will do our best to keep you as educated as we can on your particular task or project. We look forward to earning your business! Book with us online or feel free to give us a call today!

2 neighbors recently requested a quote
Avatar for Icon Consulting & Construction, Inc.
Icon Consulting & Construction, Inc.
5.0(
3
)
Find a Custom Home Builder

Serving Grapeview, WA and surrounding areas

Approved

In business since 2013

Credit card accepted

Offers commercial services

We work extremely hard for the owner and our company strives to take care of all our client's unique needs and always have the owner's best interest at heart. We are very detailed and meticulous in our work.  Our long-term vision is for us to become your go to Contractor with capabilities to do multiple types of projects.  \n \nCall us today and you'll be relieved you did. Thank you

Leveling and digging equipment
Steel layout before forming wall
Formed footing and pads, awaiting concrete.
Steel layout before forming wall
Formed footing, awaiting concrete.

+127

Response time1 day
Response rate100%
Higgins Custom Construction, LLC
3.8(
12
)
Find a Custom Home Builder

Serving Grapeview, WA and surrounding areas

Approved

In business since 2000

Free estimates

Credit card accepted

"Higgins Custom Construction removed and reinstalled my driveway. They were very professional and did an outstanding job on my driveway. I plan to work with Higgins Custom Construction for my future deck project. They were friendly and had great communication. I would recommend Higgins Custom Construction for any home improvement projects."
2 neighbors recently requested a quote
Recommended by72%of homeowners
Avatar for Elk Valley Construction, LLC
Elk Valley Construction, LLC
5.0(
4
)
Find a Custom Home BuilderFind a Modular Home Builder

Serving Grapeview, WA and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Small jobs welcome

"Dalton and his crew were hired to build a roof over an existing deck and replace a rotting fence. From the get-go, they were professional and hard working. On time and efficient, they kept us informed every step of the way. The result? What seems like a beautiful new porch and yard! We even went on to hire them for an additional project, replacing trim on our home. And the cost? Quite reasonable! We highly recommend Elk Valley Construction, LLC!"
Connie back porch/ fence
Connie back porch/ fence
Connie back porch/ fence
Connie back porch/ fence
Connie back porch/ fence

+8

Response time10 hrs
Avatar for Beman Applications, LLC
Beman Applications, LLC
5.0(
4
)
Shelter or Outbuilding - Build

Serving Grapeview, WA and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

"Chad and his team did an amazing job at a fair price and timely. The service provided was far more than just carpentry repair of hanging new doors, bifolds and trim through the house, the job included painting the interior, seal painting the floors and installing carpet through the upper floor and stairs, cleaning out and regrouting the lower floor tile then sealing, installing new sheetrock, texture to match, installing new toilets and correcting plumbing leaks, insatlling new lights fixtures and correct improperly wired outlets, cleaned the gutters, repaired damged exterior siding, landscape maintenance the entire yard. I would recommend them for ANY home improvement or repair project"
Hood Canal, Belfair, Wa
Response time1 day
Response rate86%
1 neighbors recently requested a quote
Avatar for Gruhn Homes
Gruhn Homes
5.0(
12
)
Find a Custom Home Builder

Serving Grapeview, WA and surrounding areas

In business since 2002

Free estimates

Warranties offered

"Andy was incredibly easy to work with and customizing our dream home, he was reliable, efficient, and continued to keep us updated during the process. Andy was extremely professional. Best experience with a builder we have had so far."
9th Ave Custom Home Build
Finished Exterior of Home
Previous Exterior of Home
Spacious Open Layout
Free Standing Island with Storage and Sink

+47

Response time2 days
4 neighbors recently requested a quote
Recommended by58%of homeowners
Eco Star Remodeling & Construction
4.8(
143
)
Shelter or Outbuilding - Build

Serving Grapeview, WA and surrounding areas

In business since 2022

Free estimates

Credit card accepted

"Converting our dusty old garage into a functional home office was one of the best choices we?ve made, and EcoStar Remodeling made it possible. Foster had great ideas for how to insulate the space and add windows for natural light, which really transformed it from a dark storage area to a bright, inviting workspace. The crew worked efficiently and left everything clean when they wrapped up each day. The new office has made working from home so much better, quiet, comfortable, and adds value to our house. We highly recommend Foster and his team!"
Response time2 days
Recommended by3%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Find a Custom Home BuilderFind a Modular Home BuilderShelter or Outbuilding - Build

Serving Grapeview, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
...
Showing 1-10 of 76
Home Building FAQs, answered by experts

Craftsman-style homes are predominantly found in the Western United States, specifically in Southern California, where the style originated. Since the climate was mild and there was access to plenty of natural resources, Southern California became a hub for this style at its inception. That being said, if you consult with an architect near you, you can have a Craftsman-style home anywhere.

Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction. 

Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.

Local regulations dictate how big an ADU can be, and there may also be restrictions on the percentage of the main residence’s square footage an ADU can have. In most cases, an ADU must be smaller than the main residence, but check with your local building authority to confirm restrictions on ADU size.

Yes, modular homes offer a wide range of customization options for layout, finishes, and features.

Shipping container homes last at least 25 years on average, but they can last even longer with proper maintenance. Since shipping containers are made from metal, they’re quite vulnerable to rust and corrosion. This issue is exacerbated in coastal areas or areas with a lot of precipitation. To extend the life span of your container home, install siding that protects the exterior. 

The Grapeview, WA homeowners’ guide to home building services

From average costs to expert advice, get all the answers you need to get your job done.