Top-rated contractors.

Get matched with top contractors in Rutland, VT

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Rutland, VT?

Select your specific project to find the pro for you.

TRUSTED BY RUTLAND, VT HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon17
    Verified contractor services reviews

Find Contractors in Rutland

Bowen Ridge Construction
4.6(
9
)
Major Home Repairs (General Contractor)

Serving Rutland, VT and surrounding areas

Approved

In business since 2016

Free estimates

Warranties offered

"Fantastic! Bowen Ridge Construction has a great team! They know how to get the job done! They get right to the task and do an amazing job. We were amazed as to how much they were able to accomplish in the time frame that they had! Quality work. Highly recommend! Can’t wait for them to be back for our next renovations!"
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project

+106

1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Alden Painting
Alden Painting
4.7(
41
)
Major Home Repairs (General Contractor)

Serving Rutland, VT and surrounding areas

In business since 1979

Free estimates

Credit card accepted

"John and his team completed the work in a professional, timely, and efficient manner. Perfect job from top to bottom. John is a true gentlemen. True to his word, reliable and honest - with an excellent work ethic. In my opinion, hire him. You will be extremely pleased with his work product."
Before
After
Before
After
Before

+48

Recommended by97%of homeowners
Avatar for Red Lion Construction, LLC
Red Lion Construction, LLC
5.0(
4
)
Major Home Repairs (General Contractor)

Serving Rutland, VT and surrounding areas

In business since 2024

Free estimates

Warranties offered

"Red Lion Construction really helped us out of a jam. We are closing and a home and it needed certain things repaired before the bank would give us financing. After getting the runaround or no return call from other contractors, Greg and his crew jumped at the opportunity and took time out of their schedule to provide the repairs we needed almost immediately even though they were booked up. Greg is extremely professional, and he and his crew performed nice work not only quickly, but for a fairly reasonable price also. I would definitely hire him and his crew for future projects! Without his help we would have not been able to close and purchase our home."
Kitchen
Countertops
Drink Rail
Lake Dunmore
Lake Dunmore

+14

Response time5 hrs
Recommended by50%of homeowners
...
Showing 1-10 of 52
Unfinished Carpentry questions, answered by experts

It’s best to use two screws to secure deck boards into every joist. Securing the boards to every joist makes the deck more structurally sound, while using two screws on the outer sides of the boards can help prevent warping and cupping.

You can choose 5/8-inch plywood or 3/4-inch plywood—anything thinner than these sizes may not withstand the impact of debris propelled by strong winds or can be easily torn off by intruders. Remember that the durability of the wood board is crucial, particularly for safeguarding your windows during severe storms. The effectiveness of using wood boards for protecting the investment you made in your home relies on using the appropriate material and ensuring proper installation.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Framing most homes takes anywhere between five and eight weeks to complete. You’ll need to account for inclement weather conditions, material shipment times, the number of crew members, and the weight of your materials. If the weather is too hot, wet, or cold for the installation, this process could take closer to eight weeks.

A cross brace for a fence gate should stretch from the top corner of the gate’s hinge side to the bottom corner of its latch side at a 45-degree angle to the bottom of the gate. This positioning distributes the bulk of the gate’s weight to the base of the post, taking pressure off the top hinge.

The Rutland, VT homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.