Top-rated basement remodelers.

Get matched with top basement remodelers in Rupert, VT

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Rupert, VT?

Select your specific project to find the pro for you.

Find Basement remodelers in Rupert

Bowen Ridge Construction
5.0(
7
)
Basement - Remodel

Serving Rupert, VT and surrounding areas

Approved

In business since 2016

Free estimates

Warranties offered

"Fantastic! Bowen Ridge Construction has a great team! They know how to get the job done! They get right to the task and do an amazing job. We were amazed as to how much they were able to accomplish in the time frame that they had! Quality work. Highly recommend! Can’t wait for them to be back for our next renovations!"
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project

+106

Response time1 day
3 neighbors recently requested a quote
Recommended by100%of homeowners
Calvary Custom Builders, LLC
4.3(
7
)
Basement - Remodel

Serving Rupert, VT and surrounding areas

Approved

In business since 2005

Free estimates

Emergency services offered

Calvary Custom Builders, LLC is proud to be a locally owned and operated company that serves Windham and Bennington Counties and the surrounding communities. From custom home building to remodels we will bring our years of experience to your project. We have built our business on providing 1st class craftsmanship at a fair price. Each project is unique so we will work with you on finding out what you are wanting to accomplish and making that dream become a reality. \n\nOur reputation has been built on being timely, tidy and making sure that every customer is 100% satisfied when we are done with the job. Let us show you why we are #1 in the area. Get in touch to discuss your project today!

Master Bathroom
Master Bathroom
Master Bathroom
Master Bedroom
Whole Home Remodel

+103

Response time5 days
1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Vista Home Improvement
Vista Home Improvement
4.3(
419
)
Basement - Remodel

Serving Rupert, VT and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"Vista installed new vinyl siding on our house and I couldn't be happier with the result. Our house looks brand new and I love the color. The communication was excellent! Every step of the project was very organized and I loved how Keith and Brian checked in every few days. The work crew was very repectful of our propery and the quality quality of work is amazing. Overall it was a refreshing, seamless experience. I would highly recommend them."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+41

Recommended by87%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Rupert, VT and surrounding areas

In business since 2006

Credit card accepted

"I would not use this service again. It started off great, Amanda was responsive and she really is talented. I appreciated her ideas and she steered is in a great direction out of the gate without materials and design choices. While I appreciated Amanda's ideas and loved her recommendations, once the remodel started moving forward her responsiveness was NOT at all in line with the time needed to make decisions (7-10 days to answer an email in multiple cases). I ended up having to make choices on my own in tight timelines without her input on how it would fit with the design we were working on. The reason I chose this service was to get help making smart decisions about our home remodel to minimize the time, energy and stress involved in the process. I would say this service was NOT at all appropriate for those needs. Waiting 7-10 days for help with remodel decisions simply does not cut it. I did most of the footwork and choosing on my own due to the lag in response time. While I liked Amanda and feel she was very talented, I get the feeling this company has one designer that is way overloaded with projects and she simply is not keeping up.
If you decide to go ahead with this service despite this information, make sure you schedule weekly calls and come with a list of questions well in advance of when you need answers. 
In addition, exercise caution when purchasing any materials through their discounted relationships. I ordered 2 rugs that were not available for shipment for more than 60 days after my order. Later, I decided that the rugs were not as big a priority as some other unexpected expenses that came up during the project. The rugs had still had not shipped and I had not been charged. Now I do not intend to place blame with HMD for my change of decision and given the amount of paperwork I had to sign when purchasing the rugs, I thought there would be a chance I'd be stuck with the purchase. All of that is none of their fault. The frustrating part of the situation is that it has been several weeks since I asked whether I could cancel the order all the time getting closer to the rug ship date. I got one vague email a week ago saying maybe the order could be cancelled with a restock fee. Restock fee? That doesn't make sense to me. It never left the stock, it hasn't shipped, and I haven't even been charged. Worse, I still don't known whether the order can be cancelled or not. So that process has been confusing and HMD has not been very responsive to my need for an answer. I would advise NOT to purchase anything through them unless you are absolutely sure it is perfect and it is in stock and can ship immediately. Don't plan on being able to change your mind or make returns without a hassle.
In the end I got two one hour calls and a total of about ~15 emails (short answers easily composed in 5-10 min) for $600. NOT a deal in my book. In fairness to Amanda, we also have a great looking house that I will not pretend is not due to some great advice from her at the beginning of the project. I think this company has potential if it can manage response time better especially for big projects, but I cannot recommend at current service level.

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Secoy Custom Structures
Secoy Custom Structures
4.2(
21
)
Basement - Remodel

Serving Rupert, VT and surrounding areas

In business since 2013

Free estimates

Emergency services offered

"Paul has now built us a shed, a new front porch and extended our back deck. All projects were completed in a timely manner and with attention to detail. I highly recommend his services."
Response time2 days
Recommended by70%of homeowners
Mountain House Contracting
5.0(
2
)
Basement - Remodel

Serving Rupert, VT and surrounding areas

In business since 2019

Free estimates

Small jobs welcome

At Mountain House Contracting, our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion, we work with you until the job is done. We are known for our prompt service and superior attention to detail. Our commitment to quality is evident from the beginning to the completion of your project. We are here to serve you with the knowledge and quality you deserve and expect. Call our reputable business today; you will be pleased you did.

Response time4 hrs
Recommended by100%of homeowners
Showing 1-10 of 42
Basement Remodel questions, answered by experts

To determine if your basement walls are suitable for finishing, assess their structural integrity and moisture conditions. Look for any signs of damage, such as cracks, bowing, or excessive moisture. Ensure proper drainage and address any underlying issues before proceeding. 

Consult with a professional if you're uncertain about the structural stability or potential risks associated with finishing your basement walls.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

If you’re not sure which method of raising the ceiling is best for you, here are a couple of considerations to help you make that decision. A professional ceiling company will be able to help you determine the best option for your home.

  • How long you are planning to live there: although raising the basement ceiling will increase the value of your home, if you’re planning to sell the house, then go for raising the house.

  • The condition of the foundation: to lower the floors, your foundation has to be intact whereas raising the house will allow you to restore the damaged foundation.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

The Rupert, VT homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.