Top-rated subcontractors.

Get matched with top subcontractors in Union Hall, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Union Hall, VA?

Select your specific project to find the pro for you.

TRUSTED BY UNION HALL, VA HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon461
    Verified subcontracting services reviews

Find Subcontractors in Union Hall

Mighty Dad Flooring & Home Repair
4.8(
77
)

Serving Union Hall, VA and surrounding areas

Approved

In business since 2009

Free estimates

Emergency services offered

"Had a job that required adding new subfloor, vinyl, and baseboards and Might Dad got it DONE. Where others would not work with us, he showed us what needed to be done, bought subfloor for us, and installed everything beautifully. Would recommend and will be contacting again if needed! Thanks Jeff!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Bathroom Before

+6

Response time2 days
Recommended by95%of homeowners
Avatar for Newmans Wudkreations
Newmans Wudkreations
4.7(
15
)

Serving Union Hall, VA and surrounding areas

In business since 1996

Free estimates

Emergency services offered

"Doors look very nice but I would like to be happier with the hinges. They are soft close and work fine on the smaller doors but not as good on larger doors and take room inside the cabinets because they extend inward but I would still use Newman again"
Cabinet Making Project
Cabinet Reface
New Kitchen
Bathroom Cabinets
Cabinet Refacing/Restoration Project

+21

Recommended by100%of homeowners
Avatar for Titan Handyman LLC
Titan Handyman LLC
5.0(
8
)

Serving Union Hall, VA and surrounding areas

Credit card accepted

"I highly recommend Titan! Titan performed a highly quality job at an excellent price. They kept in contact with me, even when I wasn’t in the area. They were recommended to me by a neighbor who used them and was very satisfied. If needed, I will not hesitate to use Titan again."
Roof damage due to leaking
After retaining wall and a whole lot of hard work!
Remodeling - General Project
Roof rot removed
Before retaining wall.

+6

Recommended by100%of homeowners
Avatar for B & B Services
B & B Services
4.5(
16
)

Serving Union Hall, VA and surrounding areas

In business since 2018

Free estimates

Emergency services offered

"Our furnace motor was making a loud noise, and Chris Suttles came by and diagnosed the problem shortly after I called. He fixed the problem that afternoon, and the furnace is now quieter than it's ever been. I asked him to come by the next week and give the furnace a tune-up and clean the heating ducts. When Chris opened one of the supply ducts, he found the inside of the ducts had a sticky, oil-like coating. I decided to replace the ductwork, and he replaced all of the ductwork in 2 days. The air coming out of our vents is now cleaner, warmer, and stronger."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+4

Recommended by92%of homeowners
Avatar for Nesting Sensations
Nesting Sensations
5.0(
4
)

Serving Union Hall, VA and surrounding areas

In business since 2013

Free estimates

"I had Will come to the house on two separate occasions to install baby gates and to pressure wash the front porch. He did such a good job and I look forward to hiring him for any jobs in the future!"
Underground plumbing and electrical building feeds
Handyman Services Project
Underground plumbing and electrical building feeds
Additional Photos
Additional Photos

+13

Recommended by100%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Union Hall, VA and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
...
Showing 1-10 of 55
Subcontractors questions, answered by experts

Services include creating technical drawings, floor plans, and 3D renderings for construction or renovation projects.

Builder-grade is one of two types of stock cabinets, whereas semi-custom designs allow homeowners some control over the color, finish, or hardware on their cabinets. Stock cabinets are sold in construction-grade and builder-grade designs. Construction-grade cabinets are usually made from inexpensive medium-density fiberboard, which is prone to moisture damage, whereas builder-grade models are a step up with higher-quality materials. Construction-grade designs are the most common type of cabinets in America.

Structural engineers draw structural plans, which include detailed drawings of the structural components of a home only. Complete house plans will require additional work from an architect or draftsperson, whose drawings will take the structural drawings into account. They’ll also include more details about the finishing materials and layout of a home, including everything from roofing and flooring materials to the position of furniture, light fixtures, switches, and plumbing fixtures.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

An architect is usually involved in the process of determining the layout and structural features and requirements of the home itself, taking into account the local codes, climate, and materials needed to make the home structurally sound. Architects may communicate more with contractors and subcontractors throughout the building process. In comparison to architects, interior designers typically focus on the aesthetics of a home interior and possibly exterior, helping the homeowner decide on color schemes, textures, and materials to incorporate into the design. 

The Union Hall, VA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.