Top-rated basement remodelers.

Get matched with top basement remodelers in Rocky Mount, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Rocky Mount, VA?

Select your specific project to find the pro for you.

TRUSTED BY ROCKY MOUNT, VA HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon10
    Verified basement remodels reviews

Find Basement remodelers in Rocky Mount

Avatar for Unlimited Handiworks LLC
Unlimited Handiworks LLC
4.7(
60
)
Basement - Remodel

Serving Rocky Mount, VA and surrounding areas

Approved

Super Service Award Winner

In business since 2005

Free estimates

Warranties offered

"E was a great contractor to work with. He communicated consistently about the project, upheld the quotes he gave us for each phase, handled unexpected delays (damaged products that had to be reordered) well, and worked in a timely manner on our basement. He is personable and offered insight and suggestions where needed. I felt very comfortable having him in our home doing work while we were home and while we were gone. We highly recommend Unlimited Handiworks!"
Horton Remodel
Under-deck Stone Post/ Under-deck Rain Gutter
Roanoke Remodel
 Before demo
Decks & Porches Project

+80

Response time1 day
Response rate100%
6 neighbors recently requested a quote
Avatar for Don's Improvement's, LLC
Don's Improvement's, LLC
4.5(
8
)
Basement - Remodel

Serving Rocky Mount, VA and surrounding areas

Approved

Free estimates

Warranties offered

Customers say: True professional

"Excellent work. I am very Happy with my remodeled bathroom. My bathroom is exactly like I wanted it. I highly recommend their work. My new remodeled bathroom is awesome!!"
Kitchen renovation
Bathroom renovation
Bathroom renovation
Kitchen renovation
Before demo

+47

19 neighbors recently requested a quote
Recommended by50%of homeowners
Avatar for Upgrade Remodeling LLC
Upgrade Remodeling LLC
4.6(
58
)
Basement - Remodel

Serving Rocky Mount, VA and surrounding areas

In business since 2023

Free estimates

Credit card accepted

"Two of the Upgrade Remodeling pro's showed up and did the whole job in a excellent manner. The installed and cleaned up an in a superior manner. I would highly recommend for bathroom remodel or any other job you might have for them to do."
Response time2 days
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Rocky Mount, VA and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 38
Basement Remodel questions, answered by experts

In many homes, an unfinished basement is an ideal place for an in-ground pool. The concrete floors, protection against water damage, and access to the ground below your home make this a large contender. Speak with a local basement remodeling contractor to ensure your space is right for the large construction.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

Key trends include home gyms, theatre rooms, additional rooms (bedroom/office), and more, with personalized styles reflecting individual preferences.

The Rocky Mount, VA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.