Top-rated basement remodelers.

Best basement remodelers near Harrisonburg, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Harrisonburg, VA?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Harrisonburg - Updated Nov 2026

Avatar for Heisey Home Solutions LLC
Heisey Home Solutions LLC
5.0(
3
)
Basement - Remodel

Serving Harrisonburg, VA and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

"Jared was great and punctual. He did the renovation to our basement including floors. He was affordable and there were no surprises at the end of the repair. I would recommend HHS for any future repairs."
Project Photos
5 neighbors recently requested a quote
Avatar for Rios Bros Construction LLC
Rios Bros Construction LLC
5.0(
12
)
Basement - Remodel

Serving Harrisonburg, VA and surrounding areas

Emergency services offered

Home improvement ( interior & exterior) from top to bottom. \nKitchen, Bath and Basement remodel. \n\nHigh craftsmanship and easy to work with. \nOver 10 yrs experience \n\nSmall business so not alot of over head.\n\n

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+21

Recommended by100%of homeowners
Avatar for Hudson's Home Repair & Painting
Hudson's Home Repair & Painting
4.6(
39
)
Basement - Remodel

Serving Harrisonburg, VA and surrounding areas

In business since 2007

"We called to set up appointment for an estimate and our call was answered promptly.  They set up a time to come by and give an estimate the next evening.  At that visit they gave us a bid which was in line with other bids we had received.  They said they could do the work on the following Saturday and we accepted their bid.  They were punctual, courteous, and did a very professional job.  Their original time estimate had been a 2-day job, but they finished in one day and reduced their original price estimate.  They left everything clean and even moved a heavy bookcase back into place.  We were very pleased and would call them again for another painting/remodeling job.
"
Before
During
Finish
Befor
Half Way

+2

Recommended by96%of homeowners
Avatar for Colosseum Remodeling
Colosseum Remodeling
4.6(
23
)
Basement - Remodel

Serving Harrisonburg, VA and surrounding areas

In business since 2008

Free estimates

Emergency services offered

"We hired Paolo to remodel our kitchen/dining room/living room area. He did a wonderful job making my vision a reality! I gave him a drawing on a sheet of paper and he made everything happen! His crew is tidy and super nice. Definitely want to hire again!!!"
Response time1 day
Recommended by100%of homeowners
Avatar for Upgrade Remodeling LLC
Upgrade Remodeling LLC
4.6(
58
)
Basement - Remodel

Serving Harrisonburg, VA and surrounding areas

In business since 2023

Free estimates

Credit card accepted

"We recently had our kitchen remodeled by Upgrade Remodeling, and we couldn’t be more pleased with the entire experience. From start to finish, the process was smooth, efficient, and professional. The crews that came out were incredibly hardworking, knowledgeable, and, most importantly, respectful—both toward us and our home. What really impressed us was how organized and efficient the team was. They completed the entire kitchen remodel in just 5 days, which is remarkable considering the amount of work to be done. Every step of the way, they kept the space tidy and treated our home with care, which we truly appreciated. Our new kitchen looks fantastic, and we’re so glad we chose Upgrade Remodeling. We highly recommend them to anyone looking for a reliable, skilled, and courteous remodeling team."
Response time2 days
Avatar for TWF Construction
TWF Construction
5.0(
4
)
Basement - Remodel

Serving Harrisonburg, VA and surrounding areas

In business since 1998

We are a full service construction company from the ground up. Literally from design to build. We are customer oriented and thrive on fulfilling our customers dreams and visions.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by100%of homeowners
Avatar for Keswick Renovations
Keswick Renovations
5.0(
5
)
Basement - Remodel

Serving Harrisonburg, VA and surrounding areas

In business since 2022

"Cleveland did some great work! We were finally able to finish up a long term remodeling project. Project was completed on time and on budget. Would certainly recommend Keswick Renovations"
Response time1 day
Recommended by100%of homeowners
Showing 1-10 of 46
Basement Remodel FAQs, answered by experts

Save money on your basement finishing project by making cost-effective decisions such as minimizing structural changes and avoiding costly construction revisions. DIY simpler tasks such as painting or basic cleanup to reduce labor costs. You can also opt for energy-efficient fixtures and materials that may qualify for rebates or tax incentives.

Home improvements that increase value offer a high return on investment (ROI) and can enhance your quality of life. Upgrades to your home’s curb appeal often add the most value, with garage door replacement having one of the best ROIs at 93%. Other high-value exterior projects include replacing your front door, upgrading siding and roofing, installing a stone veneer, adding new windows, and landscaping. For interior renovations, a fresh coat of paint provides an excellent ROI. Major projects like a kitchen remodel or upgrading appliances and HVAC systems also add significant value, as potential buyers appreciate the peace of mind that new equipment provides.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes. Renovating your basement has a return on investment (ROI) of 75%, meaning your remodel investment will significantly increase the value of your home. Besides the ROI, your family can enjoy a larger, more usable space while you live there. 

Permits may be required for major repairs, structural work, or electrical and plumbing restoration after a flood. Check with your local building department to determine permit requirements and associated fees for your flooded basement cleanup project. Obtaining the correct permits helps ensure work is done safely and up to code.

The Harrisonburg, VA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.