Top-rated kitchen and bathroom remodelers.

Get matched with top kitchen and bathroom remodelers in Riverside, UT

Enter your zip and get matched with up to 5 pros

Need a pro for your kitchen and bathroom remodel project in Riverside, UT?

Select your specific project to find the pro for you.

Find Kitchen and bathroom remodelers in Riverside

Avatar for Cransten
Cransten
4.5(
192
)
Bathroom - RemodelBathroom - Remodel - For BusinessKitchen - Remodel+3 more

Serving Riverside, UT and surrounding areas

Approved

Super Service Award Winner

In business since 2016

Free estimates

Emergency services offered

"Kell did a great job! He was on time and worked efficiently to get the job done. He cleaned up after the work was completed and even went above and beyond by taking care of the mess the leaking sink had left on the cabinet floor. I will be calling on Cransten handyman and remodeling for my future needs."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+18

Response time1 day
Response rate100%
4 neighbors recently requested a quote
Avatar for VAN DAM'S UNLIMITED CONSTRUCTION L.L.C.
VAN DAM'S UNLIMITED CONSTRUCTION L.L.C.
5.0(
6
)
Bathroom - RemodelKitchen - Remodel

Serving Riverside, UT and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

"I wanted to sincerely thank you for responding so quickly to the flooding in the laundry room. We truly appreciate you coming out in the middle of the night and taking care of everything, including drying the area, removing and cleaning the carpet, and fixing the doorknobs. Your prompt attention and willingness to go above and beyond did not go unnoticed. Thank you for your professionalism and care in addressing the situation."
Installed tile backsplash
Installed tile backsplash
Installed tile backsplash
Carpet repair
12 neighbors recently requested a quote
Avatar for Utah Flooring & Design
Utah Flooring & Design
3.6(
1,071
)
Bathroom - Remodel

Serving Riverside, UT and surrounding areas

Approved

In business since 1998

Free estimates

Emergency services offered

"I hired the company after being sold and promised a floor and baseboards of better quality than I had. While the product quality met expectations, installation was a problem. First, the salesman disappeared and could not be reached once the company was paid. Warning to prospective customers, once money is paid customer service suffers. The Salesman handed the project over to my project manager Amy. Amy went on an extended vacation leaving the project in pieces. I begrudge no one a vacation, but ensure your customers and their projects are taken care of before you go. There was no replacement project manager. Vinyl install and demo were crazy. The vinyl installer showed up without tools. The Demo team damaged two walls and my bullnose corners were damaged and required repairs. I had to do the repairs because they couldnâ t. The laminate went in ok, but stairs werenâ t caulked in properly. I was told by several Utah Floor and Design technicians that the customer was supposed to caulk in the wood. My contract said I paid for finish installation of baseboards and trim. Friends that had had floors done were shocked that the wood wasnâ t caulked. Utah Floors and Design did not do caulk the floor, stairs, baseboards or trim. With no project manager or salesman to reach out to, Iâ m stuck finishing this project tomorrow. The baseboard carpentry was badly accomplished. I had to contact the company and complain. They sent a manager over who walked the house, shaking his head and asked who the carpenter was. He finished most of the work and fixed mistakes. In the end, however, the job is a â Câ at best. The caulk free baseboards and stairs look unfinished and amateur. The floor is quite nice, but there are areas I will need to correct, even though I believe they were part of the contract. The kitchen counters have a 1/4 inch gap between the floor and the cabinets, no 1/4 round was purchased or installed. The demolition was a â Câ , damage to the walls and corners. The vinyl installation was a â B+â they eventually got it done well. The laminate installation was an â A-â stairs could have been better. The baseboard carpenter was a â Dâ . Had to be fixed by manager. Finish, caulking and 1/4 round, â Fâ . Not done. Lastly, communication with customer, F-. This appears to be a corporate issue. There appears to be plenty of flooring projects right now. If you hire this company, you will be on your own. Good luck"
  Flooring Done Right
  Flooring Done Right
  Flooring Done Right
  Flooring Done Right
  Flooring Done Right

+102

Response time6 hrs
68 neighbors recently requested a quote
Recommended by68%of homeowners
Avatar for SunRidge Construction LLC
SunRidge Construction LLC
5.0(
1
)
Bathroom - RemodelBathroom - Remodel - For BusinessKitchen - Remodel+2 more

Serving Riverside, UT and surrounding areas

Approved

In business since 2020

Free estimates

Customers say: Quick response

SunRidge Construction LLC is your go to contractor for any of you home improvement needs. We take great pride to ensure that every customers needs are fully met on each project. Call today for a free estimate. We look forward to working with you\n

Response time2 hrs
2 neighbors recently requested a quote
Recommended by100%of homeowners
J&L General Contractor
New to Angi
Bathroom - RemodelBathroom - Remodel - For BusinessKitchen - Remodel+2 more

Serving Riverside, UT and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

We bring over 15 years of experience in the construction industry. We proudly serve homeowners and businesses throughout Utah. We specialize in remodels, concrete, framing, and general construction—from small projects to complete renovations and new construction. We bring experience, quality craftsmanship, and expertise to every project. Our goal is to provide reliable service and deliver results our clients can be proud of.

Bathroom Remodel
4 neighbors recently requested a quote
...
Showing 1-10 of 63
Kitchen and Bathroom Remodel questions, answered by experts

Completing a full standard bathroom remodel offers the best value, with an average return on investment (ROI) of 70%. However, you don't need a full remodel to make an impact. To maximize value, focus on key components like flooring, the tub and shower, vanity, and cabinets. High-value upgrades include installing a walk-in shower, resurfacing a tub, retiling, or expanding the shower. For more budget-friendly options that still increase value, consider repainting with a light, neutral color, or updating the mirror and light fixtures. It's also crucial to address any necessary repairs, such as leaks, mold, or cracked tiles, as buyers will notice these issues. Avoid flashy upgrades like bathtub jets or steam showers, which don't add as much value.

Typically, a wet room costs more than a walk-in shower. Installing a walk-in shower costs an average of $6,700, but this price can go up for a customized shower with high-end materials. By comparison, the average price for building a wet room is $9,000, with the low end of this project hovering around $2,000 and going up to around $30,000 on the high end. Because a wet room often includes renovating the whole space, you’ll spend more on this project.

Adding a bedroom can increase a home’s value more than adding a bathroom, but it varies with factors like the location, age, and condition of the home. However, remember that you might also need to add a bathroom to the home, depending on how many bedrooms and bathrooms you currently have.

Adding a half bathroom can be worth it for two reasons: you want to increase the livability of your home and increase its value. While a value increase is more likely for a smaller home than a larger one, smaller houses with a large number of occupants can see a drastic increase in the ease and flow of daily life with the addition of a half bathroom.

How long it takes to remodel a bathroom yourself depends on the size of the bathroom, the scope of the project, your skill levels, and how much free time you have. If all you’re doing is giving the room a fresh coat of paint, you can be done and dusted in a couple of days. A large DIY bathroom remodel takes two weeks to a month.

The Riverside, UT homeowners’ guide to kitchen and bathroom remodels

From average costs to expert advice, get all the answers you need to get your job done.