Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Beaver, UT

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Beaver, UT?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Beaver

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Beaver, UT and surrounding areas

In business since 1971

Credit card accepted

"AHS is ok. They cover repairs of most everything under the roof of your house. The companies that contract with them are not always the best. You call AHS with the issue, they send a fax to the repair company and give you the contact info. If they don't contact you within 24 hours, you call them. Sometimes they answer, sometimes they don't. When they arrive (usually three days or so later), they service the item. if it has issues within the 90 days, you call AHS again, they are sent out with no charge. If the serviceman decides the unit is unrepairable, AHS will allow you to choose a replacement from their listing (usually not as good as what you have) they will install and remove your old item, or give you wholesale amount to buy and install your own. Prices vary on what you want covered and what you want the copay to be, plus where you live. For me it is 49.99 per month with a 75.00 time of service order. You can have more than one item serviced at the same time under the same fee. If you have a SEAR product the repair guys are great. Not that wild about the other ones they send out. But it is a big savings compared to calling someone on your own. The cost of service is only the 75.00 copay."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

Upkeep. Like standard pools, the cost to maintain and service your pool is a factor. However, the benefit of a spool is that it can warm up in as little as 15 minutes, while it may take several hours to heat a standard pool. This makes owning a spool more cost-effective and energy-conscious.

You should add one 3-inch chlorine tablet for every 5,000 gallons of water in your pool. If you have a smaller pool, it’s better to use 1-inch chlorine tablets so you don’t accidentally add too much chlorine. Alternatively, you can add two to three ounces of powdered chlorine or half a gallon of liquid chlorine for every 5,000 gallons of water.

Filter balls don’t work as well as sand filters because they’re unable to handle large debris, are prone to clogging, and require frequent cleaning. While they can seem more convenient and less expensive than sand filters, most need to be removed and washed regularly, or they won’t filter well and struggle with algae and dirt. Speak with your pool maintenance pro about the best filtration option for your pool.

A pool heater is worth the expense, given that it can extend your swimming season by several months, depending on where you live. For many, adding a pool heater allows the pool to remain in service from May through mid-October. Even temperatures in the 40s and 50s are tolerable when the water in the pool is heated.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Beaver, UT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.