Top-rated solar panel pros.

Get matched with top solar panel pros in San Augustine, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in San Augustine, TX?

Select your specific project to find the pro for you.

Find Solar panel pros in San Augustine

Avatar for Eastex Solar LLC
Eastex Solar LLC
5.0(
5
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving San Augustine, TX and surrounding areas

Approved

In business since 2018

Free estimates

Credit card accepted

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion, we work with you until the job is done. We are ethical, honest, and easy to communicate with. \n\nCall us today you'll be pleased you did. Thank you\n

Mission Solar System
Off-Grid
66 REC 370W Modules
Equipment Wall
25kW Ground Mounted

+3

Response time3 days
Response rate100%
4 neighbors recently requested a quote
Avatar for Premier Entry Systems
Premier Entry Systems
4.8(
54
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving San Augustine, TX and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"They arrived on time and the 2-man team completed all the work in about an hour and a half.  All work was done neatly and Rick explained all of the operational details to me. Quality equipment and a quality installation by skilled workers.  I would definitely use them again.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by100%of homeowners
Avatar for Dish Network Retailer Satellite Country
Dish Network Retailer Satellite Country
4.0(
283
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving San Augustine, TX and surrounding areas

In business since 1990

Free estimates

Credit card accepted

"I was very impressed with the installer who was sent. He mounted the dish without drilling through my new roof, which might have voided my roof warranty, Also, he mounted the dish in a location where it is easy for me to brush the snow off it in winter. I appreciate his knowledge and thoughtfulness. Also, they didn't charge me to re-install the dish."
Dish Options
Recommended by74%of homeowners
Showing 1-10 of 21
Solar Panels questions, answered by experts

In almost every case, solar panels need to be removed to replace roof shingles. In some cases, such as solar installations where the panels are on raised platforms above the roof surface, installers may be able to install new shingles without removing the solar installation. However, to get a quality roofing installation, panels need to come off. Most roofing contractors won’t remove or reinstall solar panels as part of a roofing project, so you’ll need to contact your solar provider.

The time it takes to install solar panels depends on the number of panels and the size of your home, but installation takes between two and three days of work. While most contractors can install the panels over the course of a couple of days, switching to solar energy can take two to three months in total. This includes the time it takes to design the system, procure the parts, obtain the permits, install the panels, connect to the main power grid, and get an inspection.

No, you cannot turn on a new solar system before inspection. The inspector checks that the system is correctly connected to the grid and that safety components and features are in place. This process prevents problems on the electrical grid and offers protection against fire in your home. 

Your local utility company may also require inspection documentation before you can connect to the grid. An inspection can ensure solar power efficiency and determine how you might increase it.

The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.

However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.

There are a few great questions to ask a solar contractor or inspector when you speak to them. You’ll probably want to find out about the energy yield and efficiency of your array, ensuring the actual output matches the amount you calculated when installing the array in the first place. It’s also a good idea to find out about any damage or wear and tear on the array and to inquire about how soon you need to make repairs or replacements to essential components.

The San Augustine, TX homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.