Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Penitas, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Penitas, TX?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Penitas

Avatar for Rodney
Rodney
New to Angi
Concrete Driveways - InstallInterlocking Pavers for Driveways & Floors - Install

Serving Penitas, TX and surrounding areas

Approved

Emergency services offered

Warranties offered

Small jobs welcome

Hi, I’m Rodney. I’ve spent my career in construction and enjoy helping customers bring their projects to life. I’m hardworking, dependable, and committed to doing things the right way. My goal is always to provide quality workmanship, keep communication open, and make sure every customer is satisfied with the final result. I appreciate the opportunity to work with you and look forward to helping with your next project.

1 neighbors recently requested a quote
Tex-Mix Paving, LLC
New to Angi
Asphalt Paving - Install- For Business

Serving Penitas, TX and surrounding areas

Approved

In business since 2020

Free estimates

Credit card accepted

Your next concrete project doesn't have to be stressful. At Tex-Mix Paving LLC, we believe in providing an outstanding experience for our customers. We are a concrete construction company with 8 years of experience. Tex-Mix Paving LLC can assist in all phases of concrete and general construction. We value quality, integrity and professionalism. We look forward to your call. We also accept Visa, Mastercard, Discover and American Express.\n\ntex-mixpaving.com

Response time10 mins
Avatar for ForcePro, LLC
ForcePro, LLC
New to Angi
Gate for Driveway or Security - Install or Replace

Serving Penitas, TX and surrounding areas

Approved

In business since 2025

Free estimates

Emergency services offered

We are a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We offer a variety of General Contractor services that are customizable to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!

7 neighbors recently requested a quote
Avatar for Baird Foundation Repair
Baird Foundation Repair
4.5(
90
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Penitas, TX and surrounding areas

In business since 1969

Free estimates

Credit card accepted

"Great experience with a very professional crew. The work of fixing my front sidewalk and driveway was completed quickly, on time, and looks great now! Thanks to Jackie and Ryan, who did the repair work. They were friendly, efficient, and quickly completed all the work needing to be done. They answered all my questions. I would go to Baird Foundation Repair without hesitation for any future foundation or concrete work, if the need develops. I'll be recommending Baird to all of my neighbors and friends. Oh, and the cost of the work being done actually came in a little under what I was expecting, which was a very nice surprise!"
Additional Photos
Separation between Ceilings and Walls
Cracks in Doorways
Stair Step Cracking on Exterior
Before

+4

Recommended by88%of homeowners
...
Showing 1-10 of 117
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Yes, you can retrofit an existing driveway, but this usually involves cutting grooves into the driveway, installing the heating elements, then sealing them. While this is much less expensive than typical heated driveway systems, the final appearance could be diminished. Speak with a driveway paving company to confirm which design method is best for you.

If your driveway is cracked, you can repave it with a process called asphalt overlay. Overlay is more cost-effective than a full replacement but is better suited for minor cracks and issues. If you have major cracks or other problems like water pooling, asphalt overlay isn’t your best bet. Plus, paving over a cracked driveway only extends the lifetime by about 10 years, whereas replacing it would start the clock over completely to give you up to 30 years.

The average cost of 1,500 square feet of asphalt ranges from about $10,500 to $22,500, depending on location, thickness, base material, and how accessible the job site is to crews and equipment. Keep in mind that your asphalt material cost may vary depending on its type, ranging from porous asphalt to heated blacktop. Standard asphalt costs $7 to $13 per square foot.

The Penitas, TX homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.