Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in La Villa, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in La Villa, TX?

Select your specific project to find the pro for you.

TRUSTED BY LA VILLA, TX HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon75
    Verified backsplash installation services reviews

Find Backsplash installation pros in La Villa

Avatar for All Valley Solutions LLC
All Valley Solutions LLC
4.6(
41
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving La Villa, TX and surrounding areas

In business since 1995

Free estimates

Emergency services offered

"The owner at All Valley Solutions was so generous with his time and expertise. He took time out of his busy job schedule to cut some tile into smaller pieces so that I could continue the progress on my backyard project. He responds to phone calls and is easy to get in contact with. He is professional, polite, kind, and helpful. I am hoping to hire his company in the future for a home construction and possible remodel."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+35

Recommended by94%of homeowners
Avatar for Pablo Aguayo - Master Carpenter
Pablo Aguayo - Master Carpenter
5.0(
4
)
Tile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - InstallTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install - For Business

Serving La Villa, TX and surrounding areas

In business since 1969

Free estimates

Emergency services offered

"Pablo Aguayo, we definitely used him.  The matter of fact he just completed the job for us last week.  He was remodeling our new set.  He remodeled our desks, countertops and our outside shade as a matter of fact so he did an awning for us as well.  We have used him in the past.  He had a fast crew.  They work around our new stuff without creating too much noise that were crashed.  The job is always completed on time and they are very professional.  Pricing is very fair.  We intent to use him in the very near future."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Recommended by100%of homeowners
...
Showing 1-10 of 97
Backsplash Installation questions, answered by experts

You can let the tile sit without grout. Don’t panic if there’s a delay between installing the tiles and grouting. A substantial stoppage isn't a problem, provided you keep the tile surface clear of dust and debris. Also, avoid walking over less stable ungrouted floor tiles as they are more prone to premature cracking and shifting. 

Terracotta tile is a broad term for clay tile that’s been fired in a kiln, and Saltillo tile is a specific type of terracotta tile produced in Saltillo, Mexico. In addition to Saltillo, terracotta tile comes in a range of other shades and styles. You’ll often find it used in buildings throughout Mexico, southern Europe, and the western United States.

Yes, tiling a bathroom is a great way to boost your home's value, especially if you are replacing old or dated flooring. Adding a new tile floor can deliver a return on investment (ROI) of around 56.4%, with some projects offering up to 100% ROI. Buyers appreciate new tile because it provides a modern look and is known for being durable, water-resistant, low-maintenance, and easy to clean. For the best results and highest return, consider hiring a professional, as tiling mistakes can be very noticeable and detract from the value.

On average, tiling a bathroom involves about 12 hours of labor, usually spread over two to three days to accommodate prep work and curing times. A professional tiler can often complete the installation in 6 to 8 hours, whereas a DIYer might take 10 to 16 hours. The total project time is influenced by factors like the bathroom layout, tile type, and necessary prep work, such as removing old tile. The process includes specific timelines for different areas; for example, tiling a floor takes about six hours, while a shower area can take six to ten hours. It is essential to allow for adequate curing time—typically 24 hours each—for the mortar, grout, and caulk, which is why the project extends over several days.

Ideally, you should remove tile before installing hardwood floors, but there are good reasons not to. Removing stubborn tile can be a labor-intensive job that adds days to the project. The subfloor beneath the tiles could also be damaged during the process, meaning you’d have to repair the subfloor before installing the new hardwood floor. 

The La Villa, TX homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.