Top-rated excavation pros.

Get matched with top excavation pros in Kemp, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Kemp, TX?

Select your specific project to find the pro for you.

TRUSTED BY KEMP, TX HOMEOWNERS

  • Average homeowner rating star icon4.9
    Average homeowner rating
  • Verified reviews icon31
    Verified excavation services reviews

Find Excavation pros in Kemp

Avatar for Dumpster Dog
Dumpster Dog
5.0(
10
)
Building Site - Preparation and Clearing

Serving Kemp, TX and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

"This is hands-down the best company Iâ  ve ever seen theyâ  re quick to respond. They do what they say theyâ  re going to do for the best price."
Junk Removal
Junk Removal
Junk Removal
Junk Removal
Junk Removal

+16

Response time10 hrs
36 neighbors recently requested a quote
Recommended by77%of homeowners
Avatar for 888 BUILDERS, INC.
888 BUILDERS, INC.
4.0(
20
)
Building Site - Preparation and ClearingExcavation - Major Grading or ReslopingLandscape - Minor Grading or Resloping+2 more

Serving Kemp, TX and surrounding areas

Approved

In business since 1990

Free estimates

Small jobs welcome

"I am going to be as honest as possible to help out the next person in their decision to hire him. First and foremost he is a great guy and friendly, he knows what he is doing and his workmanship is top notch. I initially hired him for a patio / porch and then a 3car garage. When he started it was going well and after I paid him a little more so he could get ahead, he would run out of material and would just leave without saying anything. His work was impressive but I felt he became complacent and started cutting corners because he ran out of money to buy materials. As an example: Not planning ahead, he left a portion of my roof exposed and the rain went into my home causing considerable sheet rock and insulation damage. He could have covered it to prevent some of the damage but his response was â I canâ t control the weatherâ . That was disappointing as I had to cover that bill myself. On the 3 car garage, I ran into the same problem. He started slowing down I was a little disappointed with the timelines. He would show up and work a few hours then leave. Despite me asking for a blueprint or plan. He failed to provide one. On several occasions he ran out of material and the work was delayed. The workers he had would come to me and say they would have to leave because there was no more material. I did notice that when you asked him questions he would get a little defensive. Unfortunately some of his hard work was tarnished by his lack of planning despite being paid in advance. Half of my structure remained exposed due to lack of planning on his part. Towards the end of the project he was piecing boards together and using left over scraps as patch up work. I did question him on a few things like hauling of the leftover material but he referred to the contract and said it was not in the contract. However, he was willing to charge me more money to get it removed. In order to end in good terms, I just wanted him to finish what he started and paid him to avoid further disappointment. I still have left over material to haul away, a few areas to patch, tape and seal. I would recommend him because of the skill he has however, I may or may not hire him again. I would let the next person know to MAKE SURE you read the contract very carefully, ask questions and request plans with a timeline or you will have to hire other people to finish his work. I have plenty of pictures to share if interested."
El Barco
Response time1 day
30 neighbors recently requested a quote
Recommended by57%of homeowners
...
Showing 1-10 of 196
Excavating questions, answered by experts

The average cost of excavation is approximately $3,200, with typical projects ranging from $500 to $15,000. Depending on the contractor, you may be charged between $50 and $200 per cubic yard or an hourly rate of $40 to $180 for an excavation specialist. The total cost is influenced by several factors, including the project size, the amount of soil to be removed, and the soil's condition. Hard soil, tree roots, or excessive rocks and clay can increase the price, potentially adding $200 to $1,200 to the final bill. Other factors that can drive up costs include the presence of nearby structures that complicate the work or tight spaces that require manual excavation instead of heavy machinery.

No, a ditch isn’t a trench. A ditch is an open, relatively shallow channel that’s carved out of the ground and used for drainage purposes. In contrast, a trench is a deeper excavation that’s entirely underground. Trenches have many uses, including gas lines, sewage systems, and electrical wiring. Unlike trenches, ditches don’t get filled back in with dirt after they’re dug.

Skunk digging looks like a series of small, cone-shaped holes on a lawn or around the perimeter of a home, porch, deck, or shed. The holes that skunks dig when searching for grubs tend to be no more than four inches in diameter and may be up to four inches deep.

Septic drain lines (or leach lines) are typically buried between 18 and 36 inches underground, and should be at least 6 inches below the surface. These pipes are perforated and surrounded by filtering materials like sand or gravel. Burying the lines at this depth helps minimize odors and allows bacteria and other biological processes in the soil to effectively treat the wastewater. Burying lines too close to the surface can cause issues unless the soil is very compact and stable.

Excavations take a few days or up to a few weeks. The time it takes to excavate an area depends on the size of the area, the type of soil, the type of excavator, and even the time of year, since winter can make digging up the ground more difficult.

The Kemp, TX homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.