Top-rated excavation pros.

Get matched with top excavation pros in Kaufman, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Kaufman, TX?

Select your specific project to find the pro for you.

TRUSTED BY KAUFMAN, TX HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon25
    Verified excavation services reviews

Find Excavation pros in Kaufman

Avatar for Dumpster Dog
Dumpster Dog
5.0(
10
)
Building Site - Preparation and Clearing

Serving Kaufman, TX and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

"This is hands-down the best company Iâ  ve ever seen theyâ  re quick to respond. They do what they say theyâ  re going to do for the best price."
Junk Removal
Junk Removal
Junk Removal
Junk Removal
Junk Removal

+16

Response time10 hrs
36 neighbors recently requested a quote
Recommended by77%of homeowners
Avatar for Truetts Excavation, LLC
Truetts Excavation, LLC
4.9(
9
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Kaufman, TX and surrounding areas

Approved

In business since 2017

Free estimates

Credit card accepted

"Mr. Bobby Truett did a superb job of clearing brush, removing tree stumps, and trimming tree limbs that posed a serious danger of damaging fencing on my property. He was extremely attentive to my needs as a custimer, communicated with me very well, and paid great attention to detail. He even worked on weekends to ensure my schedule was met! I would highly recommend Bobby for any job that requires a skid steer!"
1 neighbors recently requested a quote
Recommended by22%of homeowners
Avatar for 888 BUILDERS, INC.
888 BUILDERS, INC.
4.0(
20
)
Landscape - Minor Grading or ReslopingBuilding Site - Preparation and ClearingExcavation - Major Grading or Resloping+2 more

Serving Kaufman, TX and surrounding areas

Approved

In business since 1990

Free estimates

Small jobs welcome

"3,120 square foot house completed in May. Completed the job quickly and at a fair price. Very knowledgeable. I would hire him again because he did everything he said he would do and kept the job clean and organized."
El Barco
Response time1 day
31 neighbors recently requested a quote
Recommended by57%of homeowners
...
Showing 1-10 of 215
Excavating questions, answered by experts

Call 811 to locate and mark the gas lines at least three days before digging. In many areas, you can dig within 18 inches of the lines, though in some locations, the distance may be further. Check local regulations, as you may need a utility company representative onsite when digging. Document your calls to 811 and precautions taken to avoid gas lines. A homeowner can be held liable for hitting a gas line in some cases, but contacting the proper authorities and following all guidelines can offer protection.

The rules for trenching and excavation include setting up and following safety protocols, learning how to use tools and machines properly, and ensuring there is a safe exit for all workers. Keep heavy equipment and materials away from the edge of the hole or trench. Call the 811 dig line before starting any excavation or trenching project to ensure you don’t hit any electrical or gas lines.

The best method for digging a trench depends on the scope of the project. For a short, shallow trench (less than 2 feet deep) in light, soft soil, digging by hand may be sufficient. However, digging by hand is labor-intensive, so consider the effort required. A machine trencher is the better option for longer trenches (over 100 feet), deeper ones, or when dealing with difficult soil conditions, such as rocky or hard ground, or obstructions like tree roots. A machine can save significant time and energy in these situations.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Errors in site preparation can lead to structural failures or appear costly midway. Professionals ensure detailed, reliable home base development layouts.

The Kaufman, TX homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.