Top-rated basement remodelers.

Best basement remodelers near Canyon, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Canyon, TX?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Canyon - Updated Nov 2026

Real Estate at KT Black
New to Angi
Basement - Remodel

Serving Canyon, TX and surrounding areas

Approved

In business since 2022

Free estimates

Offers commercial services

Real Estate at KT Black is committed to excellence in every aspect of our business. \nWe uphold a standard of integrity bound by fairness, honesty, and personal \nresponsibility. Our distinction is the quality of service we bring to our customers. \nAccurate knowledge of our trade combined with ability is what makes us true \nprofessionals. Above all, we are watchful of our customers' interests and make \ntheir concerns the basis of our business.

Response time1 day
Avatar for MJL Remodeling
MJL Remodeling
4.7(
34
)
Basement - Remodel

Serving Canyon, TX and surrounding areas

In business since 2006

Free estimates

Emergency services offered

"MJL Remodeling was proactive from the initial planning of our dream project through final completion. Mark and his exceptionally kind, professional team executed every stage of the remodel with precision, attention to detail, and thoughtful recommendations that truly helped us create a perfect space. Their workmanship is outstanding, and their commitment to quality shows in every finish. If you are looking for a trusted construction team that stands by their word and delivers impeccable results, MJL Remodeling is the company to call. You can reach them through their website at https://mjlremodeling.com/about/ or by phone. Thank you again for a fantastic job"
Charles Ave Restoration
Charles Ave Restoration
Charles Ave Restoration
Charles Ave Restoration
Charles Ave Restoration

+7

Response time2 days
Response rate89%
Recommended by90%of homeowners
Avatar for MJL Remodeling
MJL Remodeling
4.7(
35
)
Basement - Remodel

Serving Canyon, TX and surrounding areas

In business since 2006

Free estimates

Credit card accepted

"Mark designed and built me the perfect pantry and mud bench for the space I had in the laundry room. He completed the project in less than a week and was professional and kind."
Charles Ave Restoration
Charles Ave Restoration
Charles Ave Restoration
Charles Ave Restoration
Charles Ave Restoration

+7

Response time3 days
Recommended by87%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Canyon, TX and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 48
Basement Remodel FAQs, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

While bathrooms and kitchens are nearly equal in terms of renovation difficulty, kitchens are the most challenging. Kitchen design, layout, electrical, and plumbing needs all depend on each other for the success of the entire project, and mistakes early in the project can cause trouble later on.

You technically can paint wires in a basement ceiling, but there are several important safety and code considerations. It's safe to paint non-metallic sheathed cable as long as the labeling remains visible. You can also paint low-voltage wires and conduit and junction boxes to help them blend into your basement. 

However, you should not paint damaged or deteriorated wiring is a fire hazard because it poses a fire hazard. The same goes for painting over high-heat wires that connect to heat-generating appliances or systems. Be sure to avoid painting multiple coats onto any wires, as that traps heat and poses fire risks.

The Canyon, TX homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.