Top-rated excavation pros.

Get matched with top excavation pros in Andrews, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Andrews, TX?

Select your specific project to find the pro for you.

Find Excavation pros in Andrews

J Villarreal Construction
5.0(
2
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Andrews, TX and surrounding areas

In business since 2010

Credit card accepted

Offers commercial services

We're a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We offer over 20 years of industry experience and a variety of home improvement services that are customizable to each individual project. We specialize in Additions and Remodels, handyman services, door and window installations, and a variety of other projects. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building lasting relationships and guarantee your satisfaction!

Response time2 hrs
Recommended by100%of homeowners
Showing 1-10 of 44
Excavating questions, answered by experts

Directional drilling is complex and requires training to use the advanced machinery. It can be challenging to monitor the position of the drill since there’s no direct line of sight. Directional drilling can also be more expensive with a cost of $10 to $30 per linear foot compared to $5 to $12 per linear foot for trenching. 

The average cost for pool excavation is $2,500. This cost can range from $450 to $4,500, depending on the pool shape and size, time of year, and any need to move buried utilities. 

When excavating for your pool, you might have to move existing utilities. You can expect to pay an additional $15 to $25 per linear foot to move gas lines. To move a septic system, it’ll cost an additional $2,000 to $20,000. A pool that is 10 feet by 12 feet averages $450 to excavate, and a 20-foot-by-40-foot pool averages $3,020.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

Whether you grind or dig up and remove your tree stump depends on your landscaping goals. Using a stump grinder leaves the root system in place for it to decompose over time, whereas digging up the tree stump removes the roots and the stump. Overall, stump grinding is a far simpler process since you won’t need to deal with the roots. Stump removal will make your yard look like a demolition site, but you’ll have an easier time replanting in the same place as your former tree.

The Andrews, TX homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.