Top-rated excavation pros.

Get matched with top excavation pros in Summertown, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Summertown, TN?

Select your specific project to find the pro for you.

Find Excavation pros in Summertown

Avatar for MackWay LLC
MackWay LLC
New to Angi
Landscape - Minor Grading or Resloping

Serving Summertown, TN and surrounding areas

Approved

When you hire MackWay, you can expect:\n\n* Prompt and reliable service\n* Honest, upfront pricing\n* Professional and courteous communication\n* Careful handling of your property\n* Clean, efficient work from start to finish\n\nWe’re a locally owned business dedicated to earning your trust through quality service and attention to detail. We look forward to helping you with your next removal project and becoming your go-to hauling partner.

...
Showing 1-10 of 96
Excavating questions, answered by experts

A crawl space can be as little as 42 inches below the grade of your house, but this is not always recommended in flood-prone areas. At a minimum, there must be at least 16 inches of clearance between the ground and the floor joists to access the space in an emergency.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

There are several methods to hollow out a tree stump, and the best one depends on your tools, experience, and priorities. Common methods include using a chisel and hammer, a chainsaw, or burning.

  • Chisel and Hammer: This is often considered the easiest approach for those with limited tools or experience, though it is the most time-consuming.

  • Chainsaw: Using a chainsaw is the fastest method, but it comes with significant safety risks, especially for inexperienced users.

  • Burning: This can be an effective method, but it is not recommended unless you can first drill holes into the stump. Without holes, the stump will be difficult to light and may not burn completely through.

A power drill with at least a ⅜-inch diameter bit can make the job quicker and easier, regardless of the primary method. While you can use a chisel or chainsaw without a drill, it will require more time and effort. Always wear protective goggles and thick gloves, as splinters are an inevitable risk.

No, fire blight does not survive free in the soil but instead is carried through insects, animals, rain, or wind during the spring. Keep in mind that it can also spread on tools, which is why you should always disinfect them in between cuts.

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

The Summertown, TN homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.