Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Michie, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Michie, TN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Michie

Avatar for Los Amigos Concrete of Henderson TN
Los Amigos Concrete of Henderson TN
5.0(
14
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Michie, TN and surrounding areas

In business since 2021

Free estimates

Credit card accepted

"Los Amos removed my old concrete driveway, poured and finished a new exposed aggregate drive. They took care to minimize surrounding landscape and did a good job overall. Theentire team was hard working and tried to made every effort to satisfy."
Foundation.
Floor
Pole barn
Pole barn
Pole barn

+47

Response time8 hrs
Response rate92%
Recommended by100%of homeowners
Avatar for West Tennessee Land Clearing and Construction Pros
West Tennessee Land Clearing and Construction Pros
5.0(
6
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Michie, TN and surrounding areas

In business since 2021

Offers commercial services

West Tennessee Land Clearing and Construction Pros, is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our trade combined with ability is what makes us true professionals. Above all we are watchful of customers' interests and make their concerns the basis of our business.

driveway
driveway
driveway
driveway
driveway

+12

Response time1 day
Recommended by80%of homeowners
Avatar for Gordon Services
Gordon Services
4.5(
11
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Michie, TN and surrounding areas

In business since 2021

Free estimates

Offers commercial services

Gordon Services, proudly serves our customers with pride, integrity and attention to details that matter most to you. This is one of the many things that sets us apart from the rest. We are locally owned and operated so give us a call today

Old Culvert
New Culvert
Preparing For New Culvert
Preparing For New Culvert
My work

+60

Response time5 hrs
Response rate91%
Recommended by80%of homeowners
Avatar for Wilcox Industries
Wilcox Industries
5.0(
9
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Michie, TN and surrounding areas

Credit card accepted

we offer quality services to our customers at an affordable price. Our friendly and experience staff is here to help with all your moving needs. At Wilcox Industries we understand that moving can be troublesome. Let us give you peace of mind in this hectic time. We would love the opportunity to earn your business.

Landscaping Project
Landscaping Project
Landscaping Project
Landscaping Project
Landscaping Project

+25

Recommended by100%of homeowners
A & W Asphalt And Sealing
4.0(
12
)
Asphalt SealingGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Michie, TN and surrounding areas

In business since 1985

Free estimates

"Had our very large driveway installed 9-10-20 Wayne and Marques and his team of great guys were very helpful and courteous. His team worked very diligently and got the job done. We highly recommend this company. Wayne returned calls when left a message very quickly. Would definitely use this company again."
Response time3 days
Recommended by81%of homeowners
Showing 1-10 of 47
Asphalt Driveways questions, answered by experts

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

If you’re looking for a similar, eco-friendly driveway material, you might consider one of these options:

  • Permeable pavement: This material is sometimes called “pervious” or “porous” pavement; it allows stormwater to drain into the subbase, eliminating storm drain costs. 

  • Gravel: Consider paving your driveway with locally sourced gravel. By sourcing from a nearby source, your money won’t fund international shipping and will be invested back into your local community.

  • Natural stone pavers: Because natural stone pavers are made from organically-produced stone, there’s no new manufacturing required, limiting the environmental impact. In addition, water easily flows and drains through the gaps in the pavers.

Recycled asphalt is a durable choice for a driveway, but doesn’t have the same appearance and low maintenance as standard asphalt. For long driveways in rural communities, recycled asphalt can make a great choice. Recycled asphalt is 20% to 30% percent less expensive than standard asphalt and is better for the environment. 

The cost to replace a driveway ranges from $8 to $15 per square foot, depending on factors that include material, size, and labor. If your driveway has deep cracks, potholes, or drainage issues (or if it’s simply past its prime), replacement might be the smarter investment over constant repairs. Resurfacing can be a cheaper alternative at $3 to $20 per square foot, but it won’t fix your driveway’s underlying problems.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Michie, TN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.