Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Michie, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Michie, TN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Michie

Avatar for Los Amigos Concrete of Henderson TN
Los Amigos Concrete of Henderson TN
5.0(
14
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Michie, TN and surrounding areas

In business since 2021

Free estimates

Credit card accepted

"Los Amigos poured concrete slab and built an outdoor pawtio for our dog shelter. We were extremely pleased with their work. They showed up on schedule, worked fast, used top quality materials, cleaned up work site when job was completed and were extremely polite with shelter volunteers. We have another project planned for the spring and will be using them again. Highly recommend them!"
Foundation.
Floor
Pole barn
Pole barn
Pole barn

+47

Response time8 hrs
Response rate92%
Recommended by100%of homeowners
Avatar for The Old Anvil
The Old Anvil
5.0(
4
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+4 more

Serving Michie, TN and surrounding areas

In business since 2024

Credit card accepted

"Noah is a very professional young man that has a great understanding on how to perfect a existing mechanical operation. We have also used him to design new electrical conveyors & sorters for the packing operation. lots of talent with this guy! Give him a shout."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by100%of homeowners
A & W Asphalt And Sealing
4.0(
12
)
Asphalt SealingGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Michie, TN and surrounding areas

In business since 1985

Free estimates

"Wayne came to our home to survey the repairs the same day I called and requested a quote. The A&W crew arrived a few days later and made the repairs in just a couple of hours. They were polite, professional and easy to work with. I would recommend A&W to anyone needing asphalt work."
Response time3 days
Recommended by81%of homeowners
Showing 1-10 of 47
Asphalt Driveways questions, answered by experts

The driveway apron is a technical term referring to where a private driveway meets the public street. If there is a sidewalk in front of the house, the driveway apron is typically on the opposite side of the public sidewalk from the driveway itself.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

Driveways should be sloped with a minimum 2% slope—anything lower will cause precipitation and runoff to collect. A 2% slope is the equivalent of a 2-foot rise over 100 feet. One quick way to check the integrity of your driveway’s slope: no more than four inches of water should collect on the surface longer than 15 minutes after rain.

The decision to repair or replace your driveway depends on the extent of the damage. If your driveway has a few small cracks, a simple repair will do the trick. If you see larger cracks and potholes, it may be time to consider resurfacing or replacement. Resurfacing is a great option if more than 25% of the surface is damaged, but if the damage is extensive—deep cracks or significant sinking—it’s best to replace the driveway entirely. A new driveway, with proper care, can last decades while patching or resurfacing might only hold up for a few years before needing more attention.

The Michie, TN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.