Top-rated driveway sealcoating pros.

Get matched with top driveway sealcoating pros in Springfield, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your driveway sealcoating project in Springfield, SD?

Select your specific project to find the pro for you.

Find Driveway sealcoating pros in Springfield

Driveway Sealcoating questions, answered by experts

It is not recommended to seal brand-new or uncured asphalt immediately after installation. You should wait at least three months to allow the asphalt time to cure. Applying a seal coat too soon can trap the asphalt's oils and chemicals, preventing it from fully hardening. This can lead to a weaker surface that is more vulnerable to damage. After the initial three-month curing period, applying a seal coat can extend the asphalt's life by protecting it from water, UV rays, and other damaging elements.

To extend the lifespan of an asphalt surface, sealcoat it every 2-3 years, repair cracks promptly, and clean it regularly to remove debris.

Yes, sealing is included to prevent staining and moisture absorption, depending on the stone type.

The three most common types of asphalt are hot asphalt, MC cold mix, and UPM asphalt. Hot asphalt is used most often for paving and patching roadways while it’s hot and workable. MC cold mix asphalt cures more slowly than hot asphalt, but it can be used for temporary patches and repairs in low-traffic areas. UPM is also used cold, but it can be used as a longer-term fix, usable in almost any conditions at almost any temperature.

Apply either one or two coats, depending on the manufacturer’s instructions.

The Springfield, SD homeowners’ guide to driveway sealcoating

From average costs to expert advice, get all the answers you need to get your job done.