Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Renner, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Renner, SD?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Renner

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)

Serving Renner, SD and surrounding areas

In business since 1971

Credit card accepted

"AHS is ok. They cover repairs of most everything under the roof of your house. The companies that contract with them are not always the best. You call AHS with the issue, they send a fax to the repair company and give you the contact info. If they don't contact you within 24 hours, you call them. Sometimes they answer, sometimes they don't. When they arrive (usually three days or so later), they service the item. if it has issues within the 90 days, you call AHS again, they are sent out with no charge. If the serviceman decides the unit is unrepairable, AHS will allow you to choose a replacement from their listing (usually not as good as what you have) they will install and remove your old item, or give you wholesale amount to buy and install your own. Prices vary on what you want covered and what you want the copay to be, plus where you live. For me it is 49.99 per month with a 75.00 time of service order. You can have more than one item serviced at the same time under the same fee. If you have a SEAR product the repair guys are great. Not that wild about the other ones they send out. But it is a big savings compared to calling someone on your own. The cost of service is only the 75.00 copay."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

Infinity pools do require slightly more maintenance than other pools because you’ll need to constantly monitor the water level. If the water level is out of whack, it won’t correctly flow over the edge, which gives the pool its infinity look. 

That said, the rest of the maintenance is largely dependent on the type of material you choose. Concrete needs a little extra care to prevent algae growth, and you will eventually need to resurface it. Fiberglass and vinyl liners are algae-resistant but they’re not as durable.

When looking into fiberglass vs. concrete pools, you will notice a big price difference. A fiberglass pool costs $15,000 to $75,000, whereas a concrete pool costs $35,000 to $100,000. While concrete pools are customizable, fiberglass is faster to install and requires less maintenance. Additionally, you can expect to pay $25,000 to maintain a concrete pool over a ten-year span. On the other hand, a fiberglass pool only requires basic maintenance like testing water levels and cleaning.

The life expectancy of a gunite pool is about 100 years or more with proper care. Clean your pool at least once a week and plan to resurface it every five to seven years. For winter, close down the gunite pool but don’t drain it. And you can increase your gunite pool’s longevity by repairing any damage and addressing any issues as soon as you notice them.

Size is the main difference between a pool and a spool. Spools are typically about half the size of an average pool, so they’re ideal for yards without the space for a full-sized pool. Spools are also easier to heat, so they tend to be a higher temperature than pools and can be adjusted to get as hot as a spa when it’s time for a relaxing soak. Spools also contain jets and blowers, while most pools do not.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Renner, SD homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.