Top-rated subcontractors.

Get matched with top subcontractors in Keystone, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Keystone, SD?

Select your specific project to find the pro for you.

TRUSTED BY KEYSTONE, SD HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon408
    Verified subcontracting services reviews

Find Subcontractors in Keystone

Avatar for REH Contracting
REH Contracting
4.8(
5
)

Serving Keystone, SD and surrounding areas

Approved

In business since 2025

Free estimates

Emergency services offered

"Rasmus and REH Contracting are wonderful to work with. They helped us with our recent deck remodel, and throughout the project Rasmus was professional, his communication outstanding and timely, his craftsmanship is excellent! I will definitely use him for future projects."
Patio Overhang
TitlePatio Overhang
Kitchen Cabinets
Response time4 hrs
4 neighbors recently requested a quote
Avatar for Concept Development LIC
Concept Development LIC
4.5(
17
)

Serving Keystone, SD and surrounding areas

In business since 2012

Free estimates

Credit card accepted

"Bernie contacted us immediately and came and gave us a quote. He also shared some ideas we had not thought of. Unfortunately we weren’t able to do the project at this time."
Custom shower
Custom bathroom
Here we are removing the old deck or the new additional rebuild
Before
Custom shower

+17

Response time3 days
Response rate100%
Recommended by75%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Keystone, SD and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Keystone, SD and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Wise Improvements
Wise Improvements
4.3(
6
)

Serving Keystone, SD and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"The project was completed with good results and I was given much consultation and information about the condition of my chimney. Extra attention was given to make sure of my safety!"
Response time2 days
Recommended by100%of homeowners
Showing 1-10 of 34
Subcontractors questions, answered by experts

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

While concrete walls do not need to "breathe" in the traditional sense of the word, they do require waterproofing and dehumidifying methods, particularly in basements below the water table. Concrete both contains moisture from its initial installation and can absorb water when exposed. Ensuring proper basement ventilation , installing a vapor barrier, and controlling water exposure are all important tasks.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Yes, modular homes offer a wide range of customization options for layout, finishes, and features.

Costs vary depending on project complexity and scope. Architects generally charge a percentage of the total budget or an hourly rate for their services.

The Keystone, SD homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.