Top-rated subcontractors.

Get matched with top subcontractors in Sturgis, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Sturgis, SD?

Select your specific project to find the pro for you.

TRUSTED BY STURGIS, SD HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon116
    Verified subcontracting services reviews

Find Subcontractors in Sturgis

Solid Rock Construction
New to Angi

Serving Sturgis, SD and surrounding areas

Approved

In business since 2007

Credit card accepted

Offers commercial services

Solid Rock Construction is your one stop shop for all of your construction and remodeling needs! We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business. Give us a call today!

8 neighbors recently requested a quote
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Sturgis, SD and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 34
Subcontractors questions, answered by experts

Yes, designers collaborate with contractors and engineers to ensure a smooth construction process.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

Costs depend on desk size, labor, included features like drawers or motorized height adjustments, and required wall anchoring.

The process involves initial consultation, concept development, detailed planning, regulatory approvals, and integration of contractor work for project execution.

The Sturgis, SD homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.