Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Howard, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Howard, SD?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Howard

JBI Epoxy
New to Angi
Concrete Finishing, Overlays & Coloring - ApplyConcrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Howard, SD and surrounding areas

In business since 2023

Free estimates

Emergency services offered

JBI Epoxy is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Avatar for Next Level Home Care
Next Level Home Care
3.5(
3
)
Concrete Floor Coating-Apply

Serving Howard, SD and surrounding areas

In business since 2025

Free estimates

Offers commercial services

"Next Level Home Care put in retaining walls, worked on regrarding, and adding a stone walk way. They did ana amazing job transforming our backyard! The retaining wall and walkway are beautiful and inviting. They were professional and easy to work with. They went above and beyond to help us achieve the look we were going for. We highly recommend them."
Response time3 days
Premier Concrete Coatings
New to Angi
Concrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Howard, SD and surrounding areas

In business since 2010

Free estimates

Credit card accepted

Premier Concrete Coatings is a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understmeet the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Showing 1-10 of 16
Epoxy Flooring questions, answered by experts

Acid-based concrete stain is generally considered the best option because it lasts about four times as long and penetrates the deepest into concrete to give richer, full-bodied colors. If you prefer more vibrant colors, though, many water-based concrete stains are available that could provide a solution you can't find from earth-toned acid-based solutions.

Resurfacing a garage floor takes about eight hours on average, with another couple hours over three days to do the epoxy. Epoxy goes on in three coats, with each coat taking 24 hours to dry and cure. You’ll need to keep foot and vehicle traffic off of your garage floor for around 4 days in total when replacing your garage floor, so be sure to plan ahead before you start. This is a great time to organize your garage since you’ll need to move everything out to apply the epoxy.

Concrete floors are durable, low-maintenance, and customizable with various finishes and colors.

As with anything you buy, be wary of prices that seem too good to be true. Some low-cost flooring products can contain chemicals that release harmful VOCs (volatile organic compounds) in the form of fumes that can be inhaled or dust that can cause skin conditions.

Even good-quality products can be dangerous for DIY-ers who don’t take proper precautions. Always carefully read manufacturer instructions and wear the recommended protective gear when working with paints and other chemicals. You can also hire a local garage flooring pro with the experience and equipment needed to perform the installation safely with no lingering fumes or debris.

Most coatings take 1-3 days, including surface preparation and drying time.

The Howard, SD homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.