Top-rated pool builders and installers.

Get matched with top pool builders and installers in Union, SC

Enter your zip and get matched with up to 5 pros

Need a pro for your pool construction and installation project in Union, SC?

Select your specific project to find the pro for you.

Find Pool builders and installers in Union

Avatar for SM & Sons LLC
SM & Sons LLC
5.0(
1
)
Swimming Pool Covers - Install or Replace

Serving Union, SC and surrounding areas

Approved

In business since 2022

Free estimates

Warranties offered

SM & Sons LLC (d/b/a Upstate Pool Covers) is a local family owned and operated company that values honesty and integrity in all aspects of our business. We proudly sell and install Meyco safety pool and spa covers in Upstate SC and Western NC. We are a certified Meyco dealer and installer. Our dedicated team of professionals have years of hands-on experience, provide innovative ideas and suggestions tailored to your cover project. Owners/Operators Chris and Greg are on site for each and every installation. Our only scope of work is safety pool and spa covers so please contact us with confidence on your cover needs.

Safety Pool Cover
Response time1 day
Response rate100%
7 neighbors recently requested a quote
Showing 1-10 of 22
Pool Construction and Installation questions, answered by experts

Depending on the type of land survey, the report will mark the boundaries of your property, the topographical changes of the landscape, as well as major natural and added structures to the plot. A more detailed survey, like an as-built survey, will note the measurements of the structures and landscape following major construction. A topographic survey will also help your contractor determine the cost of land development projects.

ALTA/ACSM surveys are the most comprehensive type of land survey and, as such, tend to be the most expensive. These surveys have standardized guidelines and reports and are used in many kinds of real estate transactions to ensure consistent and accurate information is available for properties.

While concrete walls do not need to "breathe" in the traditional sense of the word, they do require waterproofing and dehumidifying methods, particularly in basements below the water table. Concrete both contains moisture from its initial installation and can absorb water when exposed. Ensuring proper basement ventilation , installing a vapor barrier, and controlling water exposure are all important tasks.

Property lines, building locations, and potential encroachments are mapped.

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

The Union, SC homeowners’ guide to pool constructions and installations

From average costs to expert advice, get all the answers you need to get your job done.