Top-rated generator install pros.

Get matched with top generator install pros in Mullins, SC

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in Mullins, SC?

Select your specific project to find the pro for you.

Find Generator install pros in Mullins

Avatar for Mister Sparky of Florence
Mister Sparky of Florence
5.0(
16
)
Fixed Generator - InstallFixed Generator - RepairGenerator - Install+4 more

Serving Mullins, SC and surrounding areas

Approved

Super Service Award Winner

In business since 2004

Free estimates

Emergency services offered

"We had an emergency light in our electrical closet that got no power. What a weird, isolated occurrence, since no other electrical issues existed. Brian was such a pleasant technician to work with! He was knowledgeable, prompt, gave me the best possible fixature option, a reasonable price and his service was fast! Thanks, Blake and Brian. They even installed the new emergency light. I will be sure to count on you for all of our electrical needs in the future. At least, then I can expect our exit lights won't be crooked :)"
Install - Under Cabinet Lighting
Install - Outdoor Outlets
Install - Outlet Replacements
Install - Outlet
Install - Door Bell

+5

14 neighbors recently requested a quote
Recommended by31%of homeowners
Avatar for Swift Services Heating & Cooling, LLC
Swift Services Heating & Cooling, LLC
4.0(
64
)
Fixed Generator - InstallPortable Generator - InstallPortable Generator - Repair+1 more

Serving Mullins, SC and surrounding areas

Approved (Corporate)

In business since 1997

Free estimates

Emergency services offered

"Swift is an efficient and professional service company. They installed my new air conditioner quickly and with no problems. They were on time, and the installers were friendly and courteous. I would recommend them to everyone. I would not use anyone else for my AC service. They are the best!"
Response time10 hrs
69 neighbors recently requested a quote
Recommended by91%of homeowners
Kirby Electric Services
5.0(
5
)
Fixed Generator - InstallPortable Generator - Install

Serving Mullins, SC and surrounding areas

In business since 1980

Emergency services offered

Credit card accepted

"I can not say enough good things about Mr. Kirby and his company. He was very thorough, efficient and professional. I recently hired him to wire my new barn for lights and power as well as some improvements to my new home. We discussed my wishes prior to starting and his knowledge was pivotal in guiding me through the planning and supply process. He knew and adhered to all the electrical codes and he knew his business and trade. He worked very hard and was there every day until the project was complete. He even found some issues regarding previous work I'd had done and helped me resolve those in addition to the project I hired him for. I highly recommend him for ANY electrical project or problem you may have. I will always call him first for any of my future electrical needs."
Response time3 hrs
Response rate85%
Recommended by100%of homeowners
Showing 1-10 of 16
Generator Install questions, answered by experts

You can expect a diesel generator to last for up to 30,000 hours of use, which works out to 20 to 25 years with the proper maintenance, of course. That depends on how much you use it, so a diesel generator used for emergencies a couple of times a year will last a lot longer than a generator that takes over for a faulty electrical grid every month for a day or two. 

Sizing a generator is a careful process that requires calculating the electrical load of your entire house. You have to take into account every device you want to use and their wattage requirements, plus the wattage needed to start them, and look for a generator that can safely run all that at around 80% capacity.

In more practical terms, a small home can run on a 10,000-watt generator (and if you only want to power a few key appliances, much less than that). A mid-sized home may need something between 15,000 and 22,000 watts. Larger homes require 25,000 watts or more. 

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

These advanced generators use a key fob or a smartphone app to remotely start, which is ideal for getting power back on immediately without venturing outside. This feature is more common on whole home generators, but you may be able to find it on large portable generators, too.

You can determine what size generator you need for a transfer switch by matching the switch to the largest outlet on your generator. Larger generators can power up to 10 circuits, while most 5,000-watt generators can provide power to six circuits. So, if your generator’s largest outlet is 30 amps, you’ll need a 30-amp transfer switch.

The Mullins, SC homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.