Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Wells, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Wells, PA?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Wells

Avatar for Victory Driveway Sealcoating
Victory Driveway Sealcoating
5.0(
7
)
Asphalt Sealing

Serving Wells, PA and surrounding areas

In business since 2025

Free estimates

Emergency services offered

"I had a few large cracks forming in my driveway, and Victory Driveway Sealcoating took care of them quickly with their crack filling service. They explained the process, ensured everything was sealed perfectly, and the final result blends in so well you can?t even tell the cracks were there. I trust them for all my asphalt needs."
Asphalt repair
Pothole repair
Suburb home
Suburb home
Air Bnb asphalt repair

+20

Response time2 days
Response rate93%
Avatar for CM Earthworks
CM Earthworks
4.3(
9
)
Concrete Driveways - InstallGravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business+1 more

Serving Wells, PA and surrounding areas

In business since 2019

Free estimates

Emergency services offered

"Cade was very quick to respond and came and gave me an estimate. My yard has been flooding and needed to be re-graded. I also wanted a concrete pad added for a patio. Cade got the job done in a timely manner. Iâ m in the process of growing grass now. Weâ ve had heavy rain since my project was done and I have no reason to believe Iâ ll have any problems. I highly recommend CM EARTHWORKS. Cade assured me if anytime needs further attention that he will be here to take care of it."
After
After
Before
Before
After

+4

Response time2 days
Recommended by100%of homeowners
Avatar for Buddy's Quality Construction LLC
Buddy's Quality Construction LLC
5.0(
2
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Wells, PA and surrounding areas

In business since 2024

Free estimates

Emergency services offered

"This was by far the best business that I have ever dealt with. They called me every day and kept me informed of their progress. They did a fantastic job and went above and beyond what I expected. I will recommend this company to everyone and will DEFINITELY use them again for any future projects."
Debris to be removed
Damaged concrete pad
New sidewalk
Excavator using hydraulic hammer to break out shale for pad placement.
Handymen Project

+75

Recommended by100%of homeowners
Showing 1-10 of 33
Asphalt Driveways questions, answered by experts

The three most common types of asphalt are hot asphalt, MC cold mix, and UPM asphalt. Hot asphalt is used most often for paving and patching roadways while it’s hot and workable. MC cold mix asphalt cures more slowly than hot asphalt, but it can be used for temporary patches and repairs in low-traffic areas. UPM is also used cold, but it can be used as a longer-term fix, usable in almost any conditions at almost any temperature.

There’s no single best asphalt grade—it all comes down to where and how it’s used. Highways and heavy-traffic roads need something tough, like polymer-modified asphalt (PMA) or Stone Matrix Asphalt (SMA). Local roads and parking lots rely on the Performance Graded (PG) system, chosen based on climate. A PG 64-28 mix, for example, handles a broad temperature range while simpler, more cost-effective mixes are typically enough for residential driveways. The best grade of asphalt depends on traffic, weather, and your budget, which is why a professional’s input is always a smart move before making a decision.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

Instead of a set number of types, asphalt comes in variations designed for different needs. Some are categorized by temperature—hot mix, warm mix, and cold mix. Others are sorted by composition, like dense-graded, gap-graded (such as Stone Matrix Asphalt), porous, and mastic asphalt. There are also modified versions with added compounds like polymers, rubber, or emulsions. Instead of focusing on a number, it may be more useful to understand how contractors customize asphalt for durability, climate, and traffic conditions.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Wells, PA homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.