Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Greencastle, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Greencastle, PA?

Select your specific project to find the pro for you.

TRUSTED BY GREENCASTLE, PA HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon235
    Verified backsplash installation services reviews

Find Backsplash installation pros in Greencastle

Avatar for McKinney Tile and Flooring
McKinney Tile and Flooring
4.9(
12
)

Serving Greencastle, PA and surrounding areas

Approved

In business since 2019

Free estimates

Small jobs welcome

"I took the route of purchasing my materials that I wanted to use for the kitchen floor they were able to use the materials very well and installed the tile that I selected from Home Depot perfectly. I will definitely recommend them to anyone who who is looking to have their flooring done very quickly And efficiently. I will most definitely be working with them in the future for many more projects to come."
Tile Backsplash
Backsplash Detail
Tile Shower with Shelf
Tile Shower with Niche
Tile Shower

+38

Response time4 hrs
3 neighbors recently requested a quote
Recommended by91%of homeowners
Avatar for Flood Crew LLC
Flood Crew LLC
4.6(
40
)

Serving Greencastle, PA and surrounding areas

In business since 2008

Free estimates

Emergency services offered

"Bill Martins Flood Crew is excellent. In December, just before Christmas, my finished rec room flooded when my sump pump failed--soaked carpet, cardboard boxes, books, furniture with sewer water. I thought I would not find anybody this time of year to help me. But I called Bill Martins from Flood Crew, and he came out right away. He looked at the basement and gave me an analysis of my damage on the spot. He was wonderful. He took care of getting detailed estimates to my insurance company and then made arrangements for me with all the needed specialists. First, I wouldn't have known where to start, and second I wouldn't have had a clue whom to call. I needed crews to remove the carpet, cut out drywall all around to dry it out, check for mold, test for asbestos, and then remove everything. And, of course, fixing the sump pump, installing flooring, putting everything back, and lots of details in between. All of this obviously can't be completed in a week or even a month. My work was not the only project that busy contractors had. My situation was far more complicated than I thought it would be. Ultimately, it took four months, which I thought was very reasonable. And the result is so beautiful--no corners cut, no putting up with mediocre results, all this for the same price and time or less than others quote. Be patient. Be flexible. Talk with Bill about the results you want. Listen to suggestions. Your results will be beyond anything you thought was possible."
After carpets were cleaned.
Before and after of Medallion
After color sealed
Apartment carpet cleaning
Drying bathroom wood subfloor from kitchen using indirect control heat, controlled by thermostat we set in place

+57

Recommended by88%of homeowners
Avatar for Magic Mist Cleaning Services
Magic Mist Cleaning Services
4.7(
38
)

Serving Greencastle, PA and surrounding areas

In business since 1973

Free estimates

Emergency services offered

"Carpet looked great after cleaning.  My bathroom rug is an off white burber that was very dirty since my husband doesn't know how to remove his boots.  The carpet looked brand new.  My other carpets are darker so you really didn't notice how clean on them, but I would imagine that since the bathroom came out so well, the other carpets were just as great.
The men who performed the service were very nice and courteous.


"
Truck
Recommended by89%of homeowners
Avatar for JND  Construction
JND Construction
4.6(
14
)

Serving Greencastle, PA and surrounding areas

In business since 2006

Free estimates

Emergency services offered

"JND Construction was perfect for what we needed. I needed a doorbell installed in our office on EXTREMELY short notice. Dallas was able to meet me the next morning at 7am and had the job done before lunch time. They were very professional, quick, and to the point. THANK YOU SO MUCH!"
 after
Before
Back Splash
 after
DAY 1

+7

Recommended by92%of homeowners
Avatar for E-Remodeling
E-Remodeling
5.0(
6
)

Serving Greencastle, PA and surrounding areas

In business since 2018

Free estimates

"I'm a Real Estate Investor that renovate, rent and sell homes all around PA. I've been employing Ever and his team since 2019. He has renovated, updated, or repaired 12 of our properties (Single family, Townhouses, Apartments). He is my go to contacting team for all my renovations. They are professional, honest, timely, affordable and very accommodating. I HIGHLY RECOMMEND!! Tasha 20 Year Air Force Veteran Disabled"
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Additional Photos
Additional Photos

+25

Recommended by100%of homeowners
...
Showing 1-10 of 53
Backsplash Installation questions, answered by experts

It’s important to leave a gap in the corner when tiling to allow room for tile expansion. Leaving between one eighth of an inch to one tenth of an inch is enough space. 

Yes, you can use paint if you want to refresh your tile countertops. However, you must be mindful of the type of paint you use. Look for options explicitly created for tile that are also waterproof and durable. Over time, the paint will chip, so this is not considered a long-term solution for busy kitchens.

Ideally, you should remove tile before installing hardwood floors, but there are good reasons not to. Removing stubborn tile can be a labor-intensive job that adds days to the project. The subfloor beneath the tiles could also be damaged during the process, meaning you’d have to repair the subfloor before installing the new hardwood floor. 

The process takes two to four days, depending on the size of the area and your experience level. The first day involves assessing and prepping the existing tile, while the second day is for laying the new tile. This may take longer in complex areas. After letting the adhesive dry for 24 hours, grouting and sealing can be completed on day three. For larger projects or intricate tile patterns, expect the timeline to stretch a bit longer. Also, proper drying time between steps is essential for long-lasting results, which extends the project’s time.

The difference between floor and wall tiles is that floor tiles generally have higher strength and porosity ratings than wall tiles. Wall tiles are typically weaker and more likely to crack or become damaged under sustained pressure like high foot traffic. 

For this reason, avoid using wall tiles on floors and vice versa.

The Greencastle, PA homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.