Top-rated rototilling pros.

Get matched with top rototilling pros in Emporium, PA

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Emporium, PA?

Select your specific project to find the pro for you.

Find Rototilling pros in Emporium

Kunes Brothers Enterprises LLC

No reviews yet

Kunes Brothers Enterprises LLC

No reviews yet
9 years of experience

Our focus is on quality. We never cut corners,even when it my be more expensive. Some of our competitors may be cheaper, but we will take the time to make sure your 100% happy. With a combined knowledge of 25 years industrial and residential maintenance we are here to serve our customers.

Our focus is on quality. We never cut corners,even when it my be more expensive. Some of our competitors may be cheaper, but we will take the time to make sure your 100% happy. With a combined knowledge of 25 years industrial and residential maintenance we are here to serve our customers.






Rototilling questions, answered by experts

Yes, rain can affect the results of a perc test because it will partially saturate the soil and slow down the rate of drainage. Ideally, you should do a perc test during the driest time of the year and try to schedule it after a stretch of days where no precipitation occurs. This will give you the best chance of passing.

Environmental considerations include native plant selection, wildlife habitation, erosion prevention measures, and managing water runoff patterns to protect the lakefront ecosystem.

People level their yards for practical and cosmetic purposes. If you have a very steep slope in your backyard, you might have a hard time with lawn maintenance. Or, if you want to entertain in the summer but don’t have a flat yard, building a patio would be quite difficult.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

Water pooling, uneven surfaces, or basement leaks are indicators.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"