Top-rated solar panel pros.

Get matched with top solar panel pros in Wilderville, OR

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Wilderville, OR?

Select your specific project to find the pro for you.

Find Solar panel pros in Wilderville

Avatar for Green Ridge Solar
Green Ridge Solar
4.7(
6
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair - For Business

Serving Wilderville, OR and surrounding areas

Approved

In business since 2016

Free estimates

Warranties offered

"install was great and very quick. my only complaint would be on the programs for solar and how that all works for the buyer. i had to figure out the tax side on my own and the rebates went to solar company. price was ok but after the mountain of phone calls from other companies the price was on the high side."
Tualatin, OR, Solar Panel Installation
Rooftop Solar for Retired Couple in Milwaukie, OR.
Battery Backup Powers Family Tesla EV and Home in Hood River, OR
Tualatin, OR, Solar Panel Installation
Rooftop Solar for Retired Couple in Milwaukie, OR.

+27

Response time1 day
2 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Roto-Rooter of Southern Oregon
Roto-Rooter of Southern Oregon
4.7(
46
)
Solar Water Heater System - InstallSolar Water Heater System - Install - For BusinessSolar Water Heater System - Repair+1 more

Serving Wilderville, OR and surrounding areas

Approved

In business since 1935

Free estimates

Emergency services offered

Roto-Rooter offers an ever-expanding variety of repair and maintenance services to both homeowners and businesses. Our goal is to be the premier provider of repair and maintenance services. As always, we will continue to listen to customers and expand service offerings to meet and exceed their changing expectations.\n\nSee the website for additional services.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

Response time7 hrs
Response rate100%
1 neighbors recently requested a quote
Avatar for Double J Electric
Double J Electric
5.0(
10
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving Wilderville, OR and surrounding areas

In business since 2013

Emergency services offered

Credit card accepted

"We have had exellent experiences with Double J electric. They are very promt, professional and knowledgable. Quality of work is outstanding. Jamie got our Generac generator working perfectly. I was a pleasant experience from the call to the office staff to the on site service and diagnostics. Price was very reasonable for the services rendered. We will absolutely use Double J Electric for all of our electric needs in the future. You really can't go wrong with this local company who provides such quality service."
Recommended by90%of homeowners
Avatar for Choice Home Warranty
Choice Home Warranty
4.0(
5,678
)
Solar Water Heater System - InstallSolar Water Heater System - Install - For BusinessSolar Water Heater System - Repair+1 more

Serving Wilderville, OR and surrounding areas

In business since 2008

Emergency services offered

Credit card accepted

"This work was done through Choice Home Warranty, with the repair being given to Sears Services. The first Technician diagnosed the problem as being the heating element on the bottom of the ice maker not working, so the dumping motor was under stress to push out the ice from the tray. The ice maker was replaced and tested fine. However, the new ice maker was a new model (the freezer is 13 years old) and appeared to be identical except that the ice maker plug cover did not connect to the freezer wall to cover the plug. The cover was left pushed down on the electric cord and in the path of the back finger that pushes out the rear cube. That stopped the ice maker from working. Only notice it about 30 minutes after the Technician left. Called within hours but had to wait a week for the next appointment. That second appointment was postponed due to an illness of the Technician and pushed back to the following week. The Technician who came completely removed (cut off) the plug cover, which may not have been necessary. I think it would have been possible to cut off the 2 inserts molded into the cover intended to snap into slots in the freezer wall (the old cover used screws to hold it to the wall) and cover the plug and the multi-colored wires going into it. Now all that is visible. I also had the second Technician adjust the side-by-side, separate framed refrigerator and freezer as they had been misaligned by a prior Technician. The magnetic spacer between the units was preventing the refrigerator door from properly closing. The Technician was thorough in his work, removing the bottom panel of the frame kit to get to the levelers on the bottom of the units and also be able to grab and shift the units into alignment. After he left we noticed that the refrigerator door, though closing properly, seems to be easier to open . . . . like the magnetic seal is not as strong. The door closes tight but just seems different. Don't know why."
Recommended by81%of homeowners
Showing 1-10 of 11
Solar Panels questions, answered by experts

Professionals use the same methods to install solar shingles that they do for asphalt shingles, so you’ll often see a similar installation timeline of one to two days. The amount of time required will depend on the size and slope of your roof and the number of shingles installed. Weather conditions can delay installation, as working on a roof is unsafe during high winds or heavy rain.

Although solar panels harness the sun's power, they come at an environmental cost. The manufacturing process requires large amounts of water and involves hazardous materials like cadmium, silicon, and gallium arsenide. These materials don’t pose safety hazards while the panels are in use but can pose a problem when left in landfills. Over time, hazardous materials can leach into the environment. This is why recycling solar panels whenever possible is better than taking them to landfills.

DIY solar panel installations are hard to manage by yourself. You’ll likely need some help or prior experience to make the project worth the effort.

Solar panels can pay for themselves in five to 15 years, depending on the cost of your system, how much energy it generates, whether you qualify for incentives or power buybacks, and the price of energy in your area. Solar panels pay for themselves over time as they lower electricity bills, so it will take time to recoup your initial investment. However, the longer you have your system, the more money you can save and earn.

Yes, solar panel installation will require permits. The required permits will depend on where you live, as some states and cities have solar-specific permits, while others only require electrical permits to connect to the grid. In either case, it’s best to hire a reputable solar installer in your area, as a representative should handle all of the necessary permitting for you and will include the cost of the permits in your initial solar estimate.

The Wilderville, OR homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.