"I have had two issues since they installed the new sump pump and irrigation. Issue number one was water still getting passed the new concrete. The other issue is that the new concrete was not level at all which has caused issues with the new flooring I installed. However, their customer service is top notch and will work hard to take care of you."
"Damon and his crew do great work. He works hard, communicates well and is very professional. Look for yourself at 2658 Pine in North Bend. Contact him for an estimate if need any concrete work done. Highly recommended."
"Got an estimate very quickly, great response time, But then the communication was inconsistent and there was confusion about if/when to start. When I called to make sure they were coming, they did not knowfor sure whether they were to do the job, anyway, they came out when originally scheduled and the work accomplished was good (not necessarily excellent but very good). Their cleanup was virtually non existent, No drop cloth or anything else was used on the floor, they did paper over exposed beams and masked windows and doors. It took us 4 hours to clean up the floor however (unfinished concrete) and although it was unfinished, the floor still required being clean prior to finishing. Other thoughts: while they were here, I asked for estimates from the owner on other aspects of this project and the owner told me they did that type of work (concrete floor) but after asking twice, the owner never gave me an estimate. In essence while the work they did was acceptable-nearly excellent-with the communication issues and lack of cleanup I am not 100% sure whether I would hire again or not. The one additional thing in their favor is the lack of decent contractors in Salem.
Concrete Mudjacking questions, answered by experts
Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.
A good slump height really depends on the project, but there is a use for nearly all slump levels. For example, low slumps are best in projects that require structure, such as curbs and roads. High slumps often require additional reinforcement, but they flow more freely into hard-to-reach spaces.
The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.
Mudjacking is suitable for sidewalks, driveways, patios, and nearly all exterior flat structures. However, it may not suit severely damaged or heavily cracked areas.
Costs range from $500 to $1,500, depending on the size and condition of the area.
The Bandon, OR homeowners’ guide to concrete mudjacking services
From average costs to expert advice, get all the answers you need to get your job done.
DIY mudjacking is an advanced task, but learning how to raise a concrete slab is great to know for many scenarios. Let's take a look at how to DIY mudjack.
Sunken concrete can be a structural issue, but a professional can easily repair it. Ask these concrete injection leveling and mudjacking questions before you hire.