Top-rated remodel designers.

Get matched with top remodel designers in Pink, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your remodel design project in Pink, OK?

Select your specific project to find the pro for you.

TRUSTED BY PINK, OK HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon78
    Verified remodel design services reviews

Find Remodel designers in Pink

Christensen Construction
4.8(
20
)
Bathroom - RemodelBathroom - Remodel - For BusinessKitchen - Remodel+1 more

Serving Pink, OK and surrounding areas

Approved

Free estimates

Emergency services offered

Customers say: True professional

"Excellent service and very nice to work with. Very neat and clean, respectful to my home and ensuring each day work area was cleaned up. Did a wonderful job on the tile around bath tub and shower. The whole remodel Exceeded my expectations."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+44

Response time6 hrs
8 neighbors recently requested a quote
Recommended by100%of homeowners
West Shore Home Oklahoma City
4.9(
143
)
Bathroom - Remodel

Serving Pink, OK and surrounding areas

Approved (Corporate)

In business since 2006

Free estimates

Credit card accepted

"My original installer was the best and he came back to make some corrections from anotherâ s work. He was attentive to detail and ensured everything was corrected to the highest level. rrections were made at no cost to me and they even incorporated a change for me to match the main bath."
55 neighbors recently requested a quote
Recommended by98%of homeowners
Avatar for Justus Bath
Justus Bath
4.9(
36
)
Bathroom - Remodel

Serving Pink, OK and surrounding areas

Approved

In business since 2020

Free estimates

Emergency services offered

"I was very impressed with this company. For years I have saved up for a bath-to-shower remodel using tile in a particular light green color called celedon. Skyler and his expert crew created this dream for me quickly and efficiently in 3 days! I can hardly believe it. Just what I wanted, perfect color and everything! My shabby bathroom looks like something in a palace now. This is the first time that I have NOT been disappointed in a decoration project."
1.1
1.2
1.4
1.3
1.5

+23

Response time4 hrs
Response rate100%
Recommended by87%of homeowners
Avatar for Ortiz Custom Remodeling LLC
Ortiz Custom Remodeling LLC
4.1(
10
)
Bathroom - RemodelBasement - RemodelDesigner - Kitchen+2 more

Serving Pink, OK and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

"The owner and workers were very professional and knowledgeable. Absolutely no pressure on negotiation of price. I was struck by the fact the owner took personal pride and during the project offered many helpful tips and suggestions on any potential problem areas. I highly recommend them to anyone needing remodeling and painting services. Trust is huge in hiring contractors and I can certainly say this company is trustworthy!"
Kitchen cabinets
Kitchen Remodel
Kitchen Remodel
Countertop
Kitchen Remodel

+12

Response time8 hrs
2 neighbors recently requested a quote
Recommended by80%of homeowners
Avatar for Statewide Remodeling, Inc. of OKC/Tulsa/AR
Statewide Remodeling, Inc. of OKC/Tulsa/AR
3.0(
115
)
Bathroom - Remodel

Serving Pink, OK and surrounding areas

Approved

In business since 1994

Free estimates

Credit card accepted

"We had a phenomenal installer named Nick Garcia who got our install done quickly and we are very satisfied. Our kitchen looks like something out of a magazine. Thank you Nick Garcia."
Response time6 hrs
600 neighbors recently requested a quote
Recommended by65%of homeowners
Avatar for Evolution Drafting
Evolution Drafting
3.7(
126
)
Designer - Building

Serving Pink, OK and surrounding areas

Approved

In business since 2018

Free estimates

Emergency services offered

"I am having a full master bath and kitchen remodel done with new layouts in both rooms and knocking out a wall. Evolution worked with me to quickly get a drawing done of the new layouts so that the contractor could get started on the project. They made sure to include me in the process so that the design would be done exactly as my wife and I envisioned. They communicated effectively throughout the process and were always courteous and professional. I recommend them to anyone with drafting needs."
Zeal Floor Plan
Charcoal
Palm Floor Plan
Charcoal Floor 2
Charcoal Floor 1

+23

Response time1 day
Response rate100%
61 neighbors recently requested a quote
...
Showing 1-10 of 208
Remodel Design questions, answered by experts

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Most towns and cities have regulations regarding sign dimensions for businesses. If you're opening a new business, contact the town or city's local zoning board to see the specifications you need to follow when getting your sign created. There may also be rules regarding how high your sign can sit. Be sure to learn about specifications before having your sign made. Sign companies generally won't offer refunds once custom signs have been fabricated.

Costs depend on desk size, labor, included features like drawers or motorized height adjustments, and required wall anchoring.

Building permits serve a few purposes, the most important of which is to keep you and the people around you safe by ensuring your contractor does work safely and to code. Permits also help your municipality tax your property appropriately, as taxes are based on land improvements and the upgrades you make to your home. Finally, permits ensure your project won’t have a negative impact on the environment or your neighbors.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

The Pink, OK homeowners’ guide to remodel design services

From average costs to expert advice, get all the answers you need to get your job done.