Top-rated basement remodelers.

Best basement remodelers near Muskogee, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Muskogee, OK?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Muskogee - Updated Nov 2026

Avatar for Dream Ready Construction
Dream Ready Construction
5.0(
7
)
Basement - Remodel

Serving Muskogee, OK and surrounding areas

In business since 2020

Free estimates

Credit card accepted

"Foundation Pros LLC came out and did a wonderful job on repairing the foundation to my home! The quality and price were excellent! I will call them again next time I need foundation work done. Thank you!"
Response time5 hrs
Response rate99%
16 neighbors recently requested a quote
Avatar for Residential Remodeling, LLC
Residential Remodeling, LLC
4.4(
4
)
Basement - Remodel

Serving Muskogee, OK and surrounding areas

In business since 2000

Free estimates

We are a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We have many years of experience to give you confidence that we are your number one choice for your next home project. You will find us to be competitively priced with close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!

Kitchen Remodel
Before Remodel
Before title
Kitchen Remodel
Kitchen Remodel

+9

Response time1 day
Response rate94%
Recommended by75%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Muskogee, OK and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
...
Showing 1-10 of 52
Basement Remodel FAQs, answered by experts

In many homes, an unfinished basement is an ideal place for an in-ground pool. The concrete floors, protection against water damage, and access to the ground below your home make this a large contender. Speak with a local basement remodeling contractor to ensure your space is right for the large construction.

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

Yes, you can add a bathroom to an unfinished basement, but you’ll want to take proper precautions if doing so. As with any bathroom addition, you’ll need to make sure that it’s approved by local building authorities first. With unfinished basements, you especially need to keep an eye on proper ventilation practices.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Muskogee, OK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.